Provide follow-up watering treatments (maintenance) to trees and shrubs that were installed in fall 2023 at Waukegan Savanna, Edward L. Ryerson Woods, and Independence Grove Forest Preserves. The scope of work for this project shall include all labor and equipment to complete watering treatments of trees and shrubs at the above sites. Depending on rainfall during the 2024 growing season, reforestation sites (Work Sites) may require watering as many as seven times. The specific timing of watering shall be determined by Owner Project Manager based on soil conditions at the site. The Contractor shall provide all necessary equipment and tools including: vehicles, gas for travel, and watering equipment (water tanks, sprayers, pumps,