2300000117 RFB-80-23 - KRA - Upper Guidewall Repairs Locks 2 & 3

expired opportunity(Expired)
From: State of Kentucky(State)
2300000117

Basic Details

started - 22 Aug, 2022 (20 months ago)

Start Date

22 Aug, 2022 (20 months ago)
due - 30 Sep, 2022 (18 months ago)

Due Date

30 Sep, 2022 (18 months ago)
Bid Notification

Type

Bid Notification
2300000117

Identifier

2300000117
Facilities & Support Services

Customer / Agency

Facilities & Support Services
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

New Search Solicitation: 2300000117 RFB-80-23 - KRA - Upper Guidewall Repairs Locks 2 & 3 Issued: 8/22/22 Last Amended: 9/6/22Current Status: Open Start Date: Closing Date: Application Close Date: 9/30/22 2:00 PM EDTDoc Dept:Facilities & Support Services Time Left: 17 Days, 10:01:52 Buyer Name: Coordinator Name: Kyla Satterly Category: Type:Request for Bids(RFB) Response Options Buyer Information Coordinator Information Kyla Satterly(Kyla.Satterly@ky.gov)Phone:502-782-0033 Fax: Additional Dates Bid Opening Date: Application Open Date: 9/30/22 2:30 PM Award Date: Lots/Lines Groups/Components Attachments Additional Information Terms Criteria Events Pre-Qualified Vendors Pre-Qualified Grantees Public Bid Reading Intent to Award Notice of Award Auction (Bids) Lot 1: Default Description Requested More Information 1. The BASE BID Work shall include demolition of the existing Upper Guide Walls at both Kentucky River Locks 2 and 3 and
the construction of new Upper Guide Walls consisting of sheet pile walls with tie-back anchors. These sheet pile retaining walls will be constructed along the same baseline as the current guide walls upstream from the lock chambers as shown on the Drawings. The BASE BID Work will also consist of site preparation, erosion and sedimentation control with fluctuating river levels, construction access, selective demolition, dredging, earthwork, constructing tie-ins to existing lock features, slope construction and protection, temporary shoring, drainage improvements, and site grading and restoration work. Demolition work at Lock 2 shall include the Upper Guide Wall and Upper Guide Wall Extension. The replacement Upper Guide Wall at Lock 2 will feature a tie-back anchor system to stabilize the new Upper Guide Wall and the adjacent slope up to state route KY-389. This anchor system will include an earth-retaining sheet pile wall at the base of the slope with tie-backs anchored into the bedrock. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and stone slope protection. Demolition work at Lock 3 shall include the Upper Guide Wall. The replacement Upper Guide Wall at Lock 3 will feature a tie-back anchor system to stabilize the new Upper Guide Wall. This anchor system will include an earthretaining sheet pile wall at the base of the slope with tie-backs anchored into a sheet pile anchor wall. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and drainage improvements. Specifications : Service Start : 9/15/2022 Service End : 11/28/2022 View Purchase History Expand All Collapse All Product Specs Product Specs Commodity Code : 912 CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR Manufacturer : Alternate Specifications Allowed : Yes Manufacturer Part Number : Drawing Number : Product/Category Number : Piece Number : Serial Number : Color : Specification Number : Size : Warranty : Model Number : Shipping Specs Shipping Specs MSDS Required? : No Packing Instructions : Hazardous Materials : Detailed Instructions : Handling Instructions : Additional Instructions : Line Item Preference Line Item Preference Preference 1 : Weighting Factor % : 0.0 Dollar Cap $ : 0.0 Preference 2 : Weighting Factor % : 0.0 Dollar Cap $ : 0.0 Preference 3 : Weighting Factor % : 0.0 Dollar Cap $ : 0.0 Preference 4 : Weighting Factor % : 0.0 Dollar Cap $ : 0.0 Preference 5 : Weighting Factor % : 0.0 Dollar Cap $ : 0.0 Attachments: File Name Date Description Attachment Type Final_RFB_785_2300000117_1_SO_FORM.PDF 8/22/22Assembled pdf file for document [RFB,785,2300000117,1] - Solicitation PrinterAssembled Form Final_RFB_785_2300000117_2_SO_FORM.PDF 8/25/22Assembled pdf file for document [RFB,785,2300000117,2] - Solicitation PrinterAssembled Form Final_RFB_785_2300000117_3_SO_FORM.PDF 9/6/22Assembled pdf file for document [RFB,785,2300000117,3] - Solicitation PrinterAssembled Form From 1 to 3 Total: 3 Additional Information Terms and Conditions Grant Terms and Conditions Line Component Name Details 1FREE FORM From 1 to 1 Total: 1 No Records found. Criteria Description Response Required Mandatory YES Answer Response Type Expected From 0 to 0 Total: 0 No Records found. Event Date From 0 to 0 Total: 0 No Records found. Name Principal Contact Email Phone Fax From 0 to 0 Total: 0 Lot Group Line Component Vendor Grantee Description Quantity Unit Unit Price Unit Amount Contract Amount Total Amount Awarded Date Discount From 0 to 0 Total: 0 Lot Group Line Component Vendor Grantee Description Quantity Unit Unit Price Unit Amount Contract Amount Total Amount Intent to Award Date Discount Comments From 0 to 0 Total: 0 Vendor Name Amount From 0 to 0 Total: 0 Lot Group Line Component Vendor Grantee Description Quantity Unit Unit Price Unit Amount Contract Amount Total Amount Awarded Date Discount From 0 to 0 Total: 0 Vendor Name Award Amount From 0 to 0 Total: 0 Current Best Offers Lot Line Commodity Description Quantity Unit Price Total Amount Delivery Days From 0 to 0 Total: 0

Kentucky, KY 40601Location

Address: Kentucky, KY 40601

Country : United StatesState : Kentucky

You may also like

REPAIRS FOR RFS SILAGE TRUCK

Due: 30 Apr, 2024 (in 10 days)Agency: AGRICULTURAL RESEARCH SERVICE

Injector Repairs to T01-214 Truck

Due: 23 Apr, 2024 (in 2 days)Agency: DOT