The Project consists of furnishing and installing, complete in-place, approximately 2,000LF of 18-inch mainline liner (base bid) and approximately 1,500 LF of 36-inch mainline liner (alternate bid) and other miscellaneous work such as installing a point repair, cleaning debris/rock/bricks from mainline, traffic control, flow control/bypass pumping, and pre- and post-television inspection as described in the specifications and shown on drawing.Sanitary Sewer is located on prison property. Coordination with the prison is required prior to accessing the site for any reason. Contact