From: Lake County(County)
Start Date
03 Sep, 2020 (about 2 years ago)Due Date
22 Sep, 2020 (about 2 years ago)Opportunity Type
Bid NotificationOpportunity Identifier
20035Customer / Agency
Lake CountyLocation
1899 West Winchester Road Libertyville, Illinois 60048The work consists of the demolition of the existing water storage tank and its concrete supports, Air Compressor and 3
inch line. Also demo two inline pumps, two triple duty valves and two pipe reducers. Provide all parts and labor for the installation of a new Water Tank, Hydronic Pump and VAV Box Upgrades.
Refer to Root Engingeering Services project manual and drawings attached to Owner's Website as they relate to the Water Tank, Hydronic Pump and VAV Box Upgrades at Independence Grove
In accordance with the Prevailing Wage Act, 820 ILCS 130/0.01
et
seq., not less than the prevailing rate of wages for similar work in the locality in which the Work is to be performed shall be paid to all laborers, workers, and mechanics performing Work under this Contract. Occasionally, the Illinois Department of Labor may revise the prevailing rate of hourly wages to be paid; the revised rate shall apply to this Contract. The prevailing rate of wages in Lake County can be found on the IDOL website:
https://www2.illinois.gov/idol/Pages/default.aspx