SM1675180 - Replacement of Bridge No. 1800700 on MD 5 over Hilton Run

From: Maryland(State)
BPM043693

Basic Details

started - 16 Apr, 2024 (14 days ago)

Start Date

16 Apr, 2024 (14 days ago)
due - 23 May, 2024 (in 22 days)

Due Date

23 May, 2024 (in 22 days)
Bid Notification

Type

Bid Notification
BPM043693

Identifier

BPM043693
State Highway Administration

Customer / Agency

State Highway Administration
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

TitleSM1675180 - Replacement of Bridge No. 1800700 on MD 5 over Hilton RunIDBPM043693Alternate IDLot #1Round #1StatusOpen[imp]OpenClosedResponses OpenedApprovedDraftDue / Close Date (EST)Due / Close Date (EST)Solicitation TypePublic NoticePublic NoticePORFPRequest for Information & PricingRequest for InformationRequest for QuoteTechnical Envelope (Multi-Step)RFR - CATS SpecificFinancial Envelope (Multi-Step)IFB: Invitation for BidIFB: Invitation for Bid (w/ Min Quals)Price OnlyRFP: Double Envelope ProposalTORFPCost breakdownRFP: Triple Envelope ProposalService purchase - Fixed FeeService purchase - T&MQuick QuoteMain CategoryIssuing AgencyProcurement Officer / BuyerJohn1 PEIPERSee AllEmailSolicitation SummaryReplacement of Bridge No. 1800700 on MD 5 over Hilton Run. The existing bridge is a single span steel beam bridge 31’-9” (+/-) long and 33’-1” (+/-) wide. The new bridge is a single span steel girder bridge, 40’-0” long and 43’-8 1⁄2” wide, with 40’-8” of clear roadway. The
proposed typical section includes two 12’-0” lanes and shoulder widths that vary between 8’-0” and 8’-8”. The proposed bridge will be founded on steel H-piles. The project also includes the reconstruction and paving of 1,055 feet of MD 5; construction of a new stormwater management facility; placement of traffic barriers, signing, and pavement markings; removal of the existing bridge; and final landscaping of the project site. A minimum of one lane of traffic will be maintained on the bridge during construction using a system of temporary traffic signals. There is no incentive/disincentive clause for this project.Additional InstructionsONLINE ELECTRONIC BIDS for the project(s) listed below will be received by the State Highway Administration (SHA) at https://www.bidx.com/maryland/main until 12 Noon Eastern time on the date specified below for the Bid Opening, at which time they will be opened.Project Cost ClassPre-Bid Conference InformationPre-Bid Conference Date (EST)Pre-Bid Conference DetailsSmall Business Reserve DesignationNoYesNo Procurement Program Participation GoalsVSBE Participation (%)MBE Participation (%)African American MBE Participation (%)Asian American MBE Participation (%)Hispanic American MBE Participation (%)Women-Owned MBE Participation (%)DBE Participation (%)SBE Participation (%)

301 W Preston St, Baltimore, MD 21201, United StatesLocation

Address: 301 W Preston St, Baltimore, MD 21201, United States

Country : United StatesState : Maryland

You may also like

Bridge replacement on US 224.

Due: 01 Oct, 2030 (in about 6 years)Agency: Ohio Department of Transportation

GA1965180 - Project for replacement of Bridge No.1101000 on MD42 over Buffalo Run

Due: 28 Apr, 2025 (in 12 months)Agency: State Highway Administration