The work for the Chadbourne, Foss, and Michaud Sewer Pump Stations shall consist of, but not be limited to, the complete and satisfactory construction of the following: Three (3) submersible sewer pump stations in a six (6) foot diameter wet well, three (3) six (6) foot diameter precast check valve vaults, four sewer manholes, sewer piping connections to existing gravity and force mains, electrical conduits and wiring connections, three (3) VFD/control panels, removal of the three (3) existing sewer pump stations, sitework as necessary and anything else incidental to the proper completion of the project as outlined or implied in the Plans and