Brighton Canal Storm Drain Improvements

From: Utah(State)

Basic Details

started - 18 Apr, 2024 (15 days ago)

Start Date

18 Apr, 2024 (15 days ago)
due - 14 May, 2024 (in 9 days)

Due Date

14 May, 2024 (in 9 days)
Bid Notification

Type

Bid Notification

Identifier

N/A
State of Utah

Customer / Agency

State of Utah
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

23 April 2024 Brighton Canal Storm Drain Improvements Installation of storm drain, including pipe and boxes, and removal of existing pipe, boxes, and culvert. 23 April 2024 Released 4/18/2024 4:00 PM MDT Type Invitation for Bid Open 4/18/2024 5:00 PM MDT Number WVC202426407 Close 5/14/2024 10:00 AM MDT Currency US Dollar Sealed Until 5/14/2024 10:00 AM MDT 23 April 2024 Contacts Jeff Ray jeff.ray@wvc-ut.gov Phone +1 801-955-3602 23 April 2024 Commodity Codes Commodity Code Description 40170 Pipe piping and pipe fittings including adapters and angle face rings and backup flanges and baffles and bends and bushings and caps and connectors 30110 Concrete, cement, plaster, lime, mortars, metal, 30120 Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand 70111 Removal services for ornamental
plants or bushes or trees including tree and shrub removal services and lop and scatter and chaining and harrow and bullhog 72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation 72141 Paving service including highway paving and road paving and infrastructure building services and parking lot and surfacing services 72154 Fence construction services and rangeland fence and fence installation 0 - 23 April 202423 April 202423 April 202423 April 202423 April 202423 April 202423 April 202423 April 2024 mailto:jeff.ray@wvc-ut.gov Installation of storm drain, including pipe and boxes, and removal of existing pipe, boxes, and culvert. Description Required to View Event Prerequisites Required to Enter Bid There are no Prerequisites added to this event. 23 April 202423 April 202423 April 202423 April 202423 April 202423 April 202423 April 2024 Buyer Attachments 1. Brighton Canal Storm Drain Improvements_Bid Schedule (For Information Only).pdf 2. Brighton Canal Storm Drain Improvements Bid Package.pdf 3. Brighton Canal Storm Drain Improvements Project Documents.pdf 23 April 202423 April 202423 April 202423 April 202423 April 202423 April 2024 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI0NDcxLTE2MDI4NzIxNzFCcmlnaHRvbiBDYW5hbCBTdG9ybSBEcmFpbiBJbXByb3ZlbWVudHNfQmlkIFNjaGVkdWxlIChGb3IgSW5mb3JtYXRpb24gT25seSkucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI0NDcxLTE2MDI4NzMwMDBCcmlnaHRvbiBDYW5hbCBTdG9ybSBEcmFpbiBJbXByb3ZlbWVudHMgQmlkIFBhY2thZ2UucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI0NDcxLTE2MDI4NzI1MDlCcmlnaHRvbiBDYW5hbCBTdG9ybSBEcmFpbiBJbXByb3ZlbWVudHMgUHJvamVjdCBEb2N1bWVudHMucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 Questions Required Questions Group 1: Instructions: 1.1 Entered bid item unit prices? 1.2 Filled out bid documents, signed, and uploaded in Vendor Attachments area? 1.3 Uploaded scanned copy of bid bond and mailed original to 3600 Constitution Blvd, 250, West Valley City, UT 84119? 1.4 Contractor acknowledges that quality control testing per the WVC Minimum Sampling and Testing Requirements is the responsibility of the Contractor? 23 April 202423 April 202423 April 202423 April 202423 April 2024 Product Line Items Product Line Items 1. Bid Schedule No. 1 # Item Name, Commodity Code, Description Allow Alternates Qty. UOM Requested Delivery P1 Traffic Control 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P2 Storm Water Pollution Prevention Plan 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P3 Mobilization and Demobilization 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P4 Adjust Survey Monument to Grade 2 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P5 Plug Existing Storm Drain Pipe 33 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P6 Remove Existing Box Culvert & Headwalls 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P7 Remove Existing Storm Drain Pipe 1,100 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P8 Remove Existing Storm Drain Structure 8 EA - Each 150 days after award See 00 43 00 for Measurement and Payment Description P9 Site and Pavement Demolition 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P10 Clearing & Grubbing 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P11 Remove Tree - Contingency Item 60 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P12 General Excavation - Plan Quantity 2,800 CY - Cubic Yard 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P13 Potholing 8 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P14 Loose Riprap (D50 = 6 Inches) 10 CY - Cubic Yard 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P15 Asphalt Concrete Paving (6" HMA / 10" UTBC) - Major Road Mix 1,350 SY - Square Yard 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P16 Asphalt T-Patch (3” HMA, 6” UTBC) 27 SY - Square Yard 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P17 Concrete Curb & Gutter, Type A 410 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P18 Flared Driveway Approach, 6 Inch Thick 20 SY - Square Yard 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P19 Restore Chain Link Fence 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P20 Surface Restoration 1 LS - Lump Sum 150 days after award 23 April 202423 April 202423 April 202423 April 2024 0 - null See 00 43 00 for Measurement and Payment Description P21 12 Inch RCP, Class III 96 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P22 15 Inch Concrete Flared End Section 2 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P23 18 Inch Concrete Flared End Section 1 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P24 15 Inch HDPE, TYPE S 660 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P25 18 Inch HDPE, TYPE S 260 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P26 24 Inch HDPE, TYPE S 340 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P27 36 Inch HDPE, TYPE S 400 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P28 48 Inch HDPE, TYPE S 4,340 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P29 4 Inch PVC 70 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P30 6 Inch PVC 30 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P31 8 Inch PVC 90 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P32 24" Pre-Fabricated Steel Waterline Loop - Contingency Item 1 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P33 Adjust Manhole to grade 2 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P34 Adjust Water Valve to Grade 1 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P35 Stabilization Fill - Contingency Item 2,100 LF - Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P36 5' Storm Drain Manhole 6 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P37 6' Storm Drain Manhole 26 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P38 8 Inch Roof Drain System 1 LS - Lump Sum 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P39 Raise Existing Cleanout Box to Grade 1 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description 23 April 202423 April 202423 April 202423 April 2024 Service Line Items Service Line Items There are no Items added to this event. 23 April 202423 April 202423 April 2024

195 N 1950 W, Salt Lake City, UT 84116, United StatesLocation

Address: 195 N 1950 W, Salt Lake City, UT 84116, United States

Country : United StatesState : Utah

You may also like

2024 Drainage Improvements

Due: 06 May, 2024 (in 2 days)Agency: City of Hot springs

Brighton Canal Storm Drain Improvements

Due: 14 May, 2024 (in 9 days)Agency: Utah Division of Purchasing

Columbia Crystal Springs Storm Drain Improvements

Due: 22 May, 2024 (in 18 days)Agency: City of San Mateo

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.