U of D Shiple Hall Lower Level Renovations

From: Mc Carthy and Smith Inc(Co-op)

Basic Details

started - 17 May, 2023 (11 months ago)

Start Date

17 May, 2023 (11 months ago)
due -

Due Date

N/A
Bid Notification

Type

Bid Notification

Identifier

N/A
Mc Carthy and Smith Inc

Customer / Agency

Mc Carthy and Smith Inc
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Lower Level renovations to Shiple Hall. Exterior remodeling includes, but not limited to:Exterior remodeling generally includes but is not limited to: Removal of the existingconcrete terrace, removal of exterior stairs serving the Terrace, removal and replacementof areas of existing facebrick, removal of an existing planter assembly, removal andreplacement of areas of existing glazing as indicated. Construction of new concrete stairsand railings, co9nmstruction of new perimeter walls and ornamental fenbcing, supply andinstrallation of new doors frames and hardware, supply and installation of new exteriorlighting a, outlets and relkated conduits and conductors.3. Interior remodeling generally includes but is not limited to:Demolition of portrions ofexisting walls, and ceiling assemblies. renovations of existing toilet rooms, kitchenette,laundry, mechanical spaces, study rooms and student activity areas, including floor, walland ceiling finishes, new doors, frames and hardware, new replacement glazing forexterior window systems, new electrical lighting, power and auxiliary systems, newplumbing and HVAC systems and additional scope noted in the Construction

24317 Indoplex Cir, Farmington Hills, MI 48335, USALocation

Address: 24317 Indoplex Cir, Farmington Hills, MI 48335, USA

Country : United StatesState : Michigan

You may also like

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.