P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, C...

From: Federal Government(Federal)
N6247324R5227

Basic Details

started - 23 Apr, 2024 (6 days ago)

Start Date

23 Apr, 2024 (6 days ago)
due - 22 May, 2024 (in 23 days)

Due Date

22 May, 2024 (in 23 days)
Bid Notification

Type

Bid Notification
N6247324R5227

Identifier

N6247324R5227
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (709039)DEPT OF THE NAVY (156968)NAVFAC (10916)NAVFAC PACIFIC CMD (3912)NAVFAC SOUTHWEST SW (132)NAVFACSYSCOM SOUTHWEST (125)

Attachments (8)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Buildcontract for the design and construction of 10 MW (6.5 MW Base Item and 4MW in option items) of Battery EnergyStorage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of theestimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and theassociated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation'selectric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into theinstallation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PVvariability and stabilize the grid (electrical distribution system reliability), provide power to support black-start andislanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energymanagement/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cybersecure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. Theproject installs and fully permits new BESS capable of parallel operation, each located in proximity to existing

Twentynine Palms ,
 CA  92277  USALocation

Place Of Performance : N/A

Country : United StatesState : CaliforniaCity : Twentynine Palms

Office Address : 750 PACIFIC HIGHWAY SAN DIEGO , CA 92132-0001 USA

Country : United StatesState : CaliforniaCity : San Diego

You may also like

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 237130Power and Communication Line and Related Structures Construction
pscCode Y1NZCONSTRUCTION OF OTHER UTILITIES