20th and Welton Highblock Replacement (20% SBE Goal)

From: Regional Transportation District(Transportation)
IFB 324DR002

Basic Details

started - 27 Mar, 2024 (1 month ago)

Start Date

27 Mar, 2024 (1 month ago)
due - 08 May, 2024 (in 2 days)

Due Date

08 May, 2024 (in 2 days)
Bid Notification

Type

Bid Notification
IFB 324DR002

Identifier

IFB 324DR002
Regional Transportation District

Customer / Agency

Regional Transportation District
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

RTD would like Contractor to perform demolition and replacement of the 20th & Welton Highblocks. Address and specific location information is provided in the Plans/Specifications.BackgroundThe scope of this project is more specifically described within the Contract Documents, but can be generalized by the following summary of activities:Base Contract: 1. Demolition of existing highblocks – Complete demolition and removal of the existing concrete highblocks and partial foundation removal on the Northbound and Southbound platforms. 2. Rehabilitation of Existing Canopy Columns – Partial demolition and rehabilitation of existing canopy column and concrete encasement. Replacement of four 3” diameter steel pipe columns and concrete encasement at both the Northbound and Southbound platforms. 3. Concrete Slab Construction – Casting of concrete foundations for new highblocks on the Northbound and Southbound platforms with subgrade preparation and grounding for stray current. 4. Steel
Highblocks – Installation of highblocks composed of structural steel framing with Fiber Reinforced Polymer (FRP) decking. 5. Handrail Installation – Steel handrails to be installed on both the Northbound and Southbound platforms. 6. Painting – All structural steel framing and handrails to be coated in a high-performance industrial coating for corrosion resistance. Incidental Work included in this Contract includes, but is not limited to, the following: 1. Required schedules and meetings. 2. Shoring Plans for canopies to be in place during the work, signed and stamped by a Colorado P.E. 3. Traffic and Pedestrian Control Plans. 4. Quality Control Plan. 5. Safety Plan. 6. Work Plan. 7. Materials testing. 8. Product data submittals.TimelineIFB advertised and made available to prospective bidders.:March 27, 2024Pre-bid briefing (Non-Mandatory):April 11, 2024, 10:30am Pre-Con Walkthrough will be held on location at 20th & Welton Streets, Denver, Colorado.Inquiry Period: Written questions from prospective bidders are to be received in the online procurement portal.:April 17, 2024, 2:00pmRTD sends responses to written questions, if any, to all prospective bidders through RTD’s online procurement portal.:April 24, 2024, 3:30pmBids due: Bids must be received through RTD’s online procurement portal.:May 8, 2024, 12:00am Bids will be publicly opened and read at in an online Teams meeting. Online: teams.microsoft.comMeeting ID: 248 171 965 229 Passcode: VMNQxE By Phone: 720-442-6193 Phone conference ID: 682 294 613#RTD anticipates making final selection.:May 15, 2024

1600 Blake Street Denver, CO 80202Location

Address: 1600 Blake Street Denver, CO 80202

Country : United StatesState : Colorado