Scope of WorkCanterbury Street to Adelaide Street.Without limiting the scope of the contract, the work generally includes:Removal of asphalt, road base, sewers, and sidewalk,Supply & install sanitary sewer (200 to 250 mm diameter) & appurtenances,Supply & install storm sewer (250 to 375 mm diameter) & appurtenances,Supply & install watermain (150 to 200mm diameter) & appurtenances,Supply & install sidewalk,Supply & place roadway granulars & base asphalt, andRestore driveways & boulevards.Refer to Tender Document for additional details. Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $418.95, per bid fee -