Demolition and replacement of a 0.95 mgd wastewater treatment plant (WWTP). The new WWTP will consist of three (3) aeration basins with fine bubble diffuser, two (2) octagonal clarifiers, two (2) chlorine contact basins with wide-band diffusers, three (3) two-staged digesters, NPW skid system with Pressure tank, RAS pump station, WAS airlift system, and a chlorine gas feed system. The project includes three (3) split-faced CMU buildings including: Blower/Electrical Building, Restroom/Storage Building, and Chemical Feed Building. The Small Lift Station will be rehabbed including pump replacement, electrical modifications, wet well blast and recoating, and replacements of all pipes, fittings, and other appurtenances. In addition, the existing Rotary Drum Screen and Press will be relocated to the new headwork structure, and the demolition of the existing WWTP will include regrading, basin removal, and cutting, plugging, and abandoning existing wastewater pipes. The scope also includes site work, site grading, plant piping, protective coating, paving, electrical duct banks, conduit, wiring, controls and integration. - Contact Info Contact: Darla Dewar Phone: 713-942-2755 Fax: 713-942-2799 Email:
dkd@as-engineers.com Bid Package