Lewis & Clark RWS - Treated Water Plant - Phase 3

expired opportunity(Expired)
From: Banner Associates Inc(Co-op)
8958832

Basic Details

started - 24 Jan, 2024 (3 months ago)

Start Date

24 Jan, 2024 (3 months ago)
due - 21 Mar, 2024 (1 month ago)

Due Date

21 Mar, 2024 (1 month ago)
Bid Notification

Type

Bid Notification
8958832

Identifier

8958832
Banner Associates, Inc

Customer / Agency

Banner Associates, Inc
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Closing Date:Thu, 03/21/2024 02:00 PM CDTProject Bid Received By & Opening Information:Lewis & Clark Regional Water System of Tea, South Dakota will receive bids for construction for the Water Treatment Plant – Phase 3 Project. The Project is located north of Vermillion, South Dakota at the Lewis & Clark Water Treatment Plant (31474 SD Hwy 19). Bids for the construction of the Project will be received at the Lewis & Clark Regional Water System office located at 1800 Monty Street, Tea, SD 57064, until March 21, 2024 not later than 2:00 PM local time (our clock). At that time, the Bids received will be publicly opened and read.Pre-Bid Meeting Info:A pre-bid conference for the Project will be held on March 7, 2024 at 10:00 AM local time at the Lewis & Clark Water Treatment Plant located at 31474 SD Hwy 19, north of Vermillion, South Dakota. Attendance at the pre-bid conference is encouraged. Description: Description:Base Bid consisting of: Construct new influent box and chemical feed
points. Two solids contact basins equipped with mechanisms, 85 ft. diameter with 20 ft. side water depth. Chemical feeding and handling systems for:  3rd Lime Slaker  Conversion of existing chlorination system to a gas system  Add aqueous ammonia storage tank and pumps  Powdered activated carbon system • Construction of an addition to the existing maintenance shop. • Construction of a second gravity sludge thickener. • Site work including:  Excavation and finish grading  Repair and replacement (in kind) of existing access roads and parking areas  Required site piping  Drainage improvements  Seeding as needed for erosion control • Process instrumentation and control systems. • Security systems. • Fill to capacity each new chemical storage tank or unit prior to start-up. • Topsoil placement, reclamation, seeding, clean-up, startup, and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents. Bid Alternate No. 1 consisting of: • Clearwell, two bays, each with a nominal capacity of 1.5 million gallons. • Modifications and piping changes in the existing wetwell. • Site work including:  Excavation and finish grading  Repair and replacement (in kind) of existing access roads and parking areas  Site piping connections and modifications  Drainage improvements • Process instrumentation and control systems. • Topsoil placement, reclamation, seeding, clean-up, startup, and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents. Solicitor Details Solicitor Name:Banner Associates, Inc - Brookings, SDDesign Discipline:Project ManagerAddress:409 22nd Avenue South, Brookings, SD - 57006-0298 Phone:605-692-6432Fax:605-692-5714Contact:Kristin BisgardEmail: kristinb@bannerassociates.com

409 22nd Avenue South,
                        
                        Brookings,
                        SD - 57006-0298Location

Address: 409 22nd Avenue South, Brookings, SD - 57006-0298

Country : United StatesState : South Dakota

You may also like

USS LEWIS PULLER ESB-3

Due: 30 Apr, 2024 (in 1 day)Agency: DEPT OF DEFENSE

Classification

Dot