Hydraulic System Replacement, Pike Island Locks and Dam

expired opportunity(Expired)
From: Federal Government(Federal)
W911WN23B8005

Basic Details

started - 15 Dec, 2022 (16 months ago)

Start Date

15 Dec, 2022 (16 months ago)
due - 15 Dec, 2022 (16 months ago)

Due Date

15 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
W911WN23B8005

Identifier

W911WN23B8005
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708180)DEPT OF THE ARMY (132982)USACE (38072)LRD (5554)US ARMY ENGINEER DISTRICT PITTSBURG (470)

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

BID OPENING HELD THURSDAY, 15 DECEMBER, 2022 AT 11:00PM EST. Bid Opening Results and Attendance Sheet are attached. UPDATE: 12 December 2022 - Amendment 0002 is now posted. The Invivitation for Bid deadline is not extended. Please see attached Amendment 0002 and Attachments 07-12 for details. Amendment 0001, original IFB, and Attachments 01-06 are also uploaded. Amendment 0001, original IFB, and Attachments 01-06 had been previously posted to PIEE only. UPDATE: 30 November 2022 - Documents from Site Visit on 30 November 2022 In-Person Site Visit added, to include Agenda and Site Visit Sign-In Sheet. Bid due date and time remain unchanged. UPDATE: 23 November 2022 - Documents from Site Visit on 23 November 2022 In-Person Site Visit added, to include Agenda, Contracting Discuss, Site Visit Sign-In Sheet, and U.S. Department of Labor Resources. Bid due date and time remain unchanged. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the
central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will include a new four-corner hydraulic system for each lock chamber consisting of Hydraulic Power Units (HPUs) for the miter gates and culvert filling/emptying valves. The new HPUs shall be located in new precast buildings at the following locations: ?Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. ?Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates. The modified four-corner system reduces the number of HPUs on the middle wall from four to two. ?Two (2) HPUs on the land wall; one upstream and one downstream for operation of the Auxiliary Chamber culvert valves and miter gates. The contract specifically includes: a.Installation of new power, control, and fiber optic cables for the six (6) HPUs. Includes modifying the existing control stations in each control shelter for the addition of the new HPUs and miter gate controls. Includes installation of a new operator control station in the middle wall Operations Building. b. Furnishing and installation of six (6) HPUs, stainless steel hydraulic piping, and hydraulic oil. c. Furnishing and installation of six (6) precast buildings which includes raised concrete pads, power distribution equipment, associated electronics and hardware, and new utility trench covers in various areas of the lock. d. Furnishing and installation of new Motor Control Center (MCC) distribution equipment. e. Demolition and disposal of existing central hydraulic system located in the middle wall Operations Building. This includes all motors, pumps, reservoir, filters, associated piping, and proper disposal of hydraulic oil. f. Demolition and removal of all existing central hydraulic oil lines on the river, middle, and land walls. This includes all lines for pressure and return to each miter gate and culvert valve cylinder. Removal and proper disposal of hydraulic oil and components will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government.*Visit the following site for further details and Bid Submission:https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8005

,
  26003  USALocation

Place Of Performance : , 26003 USA

Country : United StatesState : West Virginia

You may also like

MEDICAL AIR SYSTEM MAINTENANCE

Due: 31 Jan, 2028 (in about 3 years)Agency: VETERANS AFFAIRS, DEPARTMENT OF

IFB-22035 Replacement Building at Furley Elementary Amendment #1

Due: 31 May, 2024 (in 1 month)Agency: Baltimore City Public Schools

6640--West Haven Lab Vacuum System Replacement

Due: 30 Apr, 2024 (in 4 days)Agency: VETERANS AFFAIRS, DEPARTMENT OF

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification