Institution NC State University Institution URL for Additional
Information about this Project (Optional)
http://facilities.ofa.ncsu.edu/category/ads/ Project Name Central Campus Electrical Upgrade Phase 2 - Distribution Prequalifying for The project scope includes installation of new 15kV
distribution to include underground ductbank, cables,
manholes, and switchgear.
To qualify, the contractor must have a general or an
unlimited electrical contractor's license in the State
of North Carolina as well as applicable bonding
requirements.
The contractor must show comparable work experience, both in
complexity and dollar value, and preferably in a University
campus environment, to the scope of work outlined above. Main Contact for Submission Campus Contact Name of Design Firm Design Firm Contact Name Design Firm Telephone Number (817) 840-2873 Design Firm Email
jhardin@burnsmcd.com CM at Risk Firm Name CM at Risk Firm Email Campus Contact Email
dllallat@ncsu.edu Due Date 12/13/2019 Due Time 5:00 pm Submit To To be considered, the contractor must obtain an application
package, downloaded from the following link:
http://facilities.ofa.ncsu.edu/category/ads/ and submit
three (3) sealed, fully completed qualification documents by
5:00 PM, 12/13/19, to
Damian Lallathin, project manager, at Administrative
Services Building III, 2701 Sullivan Dr., Suite 331, NCSU,
Campus Box 7520, Raleigh, NC 27695-7520. Completed
qualification packages will not be accepted