The main objective is to replace the existing standard ground panel boards with Isolated Power Systems (IPS)/Isolated Power Panels (IPP) in the 3rd floor operating rooms OR-1, OR-2, OR-3, OR-4, Special OR-1(OR-5), Special OR-2(OR-6), Special OR-3(OR-7), Cystoscopy OR-1(OR-11), Cystoscopy OR-2(OR-10) and provide redundant sources of power from two different critical branch Automatic Transfer Switches (ATS) circuits in each OR to comply with current VA Criteria. Contractor shall read and analyze the complete Design Package and performed all construction activities (build, installation, replacement, wiring, control, calibration, adjustment, testing, etc) while maintaining the operation of the OR during construction as per the 100% Final Design, Narrative and Specifications provided by the Architect Engineer (AE) firm.Price Proposal due: 11/11/2022 at 1:00 PM (EST)Site Visit: 10/18/22 at 10 AM at Miami VAMC, West Patio EntranceRFIs Due: 10/27/2022 at 1:00 PM