CULVERT PIPE REPLACEMENT – WATERBURY AVE @ C-39 AND FREEHOLD AVE @ C-41R

expired opportunity(Expired)
From: Palm Bay(City)
ITB-33-0-2020/JG

Basic Details

started - 08 Feb, 2020 (about 4 years ago)

Start Date

08 Feb, 2020 (about 4 years ago)
due - 10 Mar, 2020 (about 4 years ago)

Due Date

10 Mar, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
ITB-33-0-2020/JG

Identifier

ITB-33-0-2020/JG
City of Palm Bay

Customer / Agency

City of Palm Bay
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Agency City of Palm Bay
Bid Type Invitation to Bid
Bid Number ITB-33-0-2020/JG
Fiscal Year 2020
Bid Writer Jessica Graham
Bid Name CULVERT PIPE REPLACEMENT – WATERBURY AVE @ C-39 AND FREEHOLD AVE @ C-41R
Bid Status Awarded
Bid Status Text None
Award To
Due Date/Time 3/10/2020 5:00 PM Eastern
Broadcast Date 2/8/2020
Bid Bond 10%
Project Estimated
Budget $821,320.69
Plan (blueprint)
Distribution Options None
Distribution Method Download and Mail
Distributed By DemandStar
Distribution Notes None
Scope of Work This project includes the removal and replacement of failed culvert pipes at two separate, individual locations: Waterbury Ave at C39 and Freehold Ave at C-41R. Construction of these projects are all turn-key and will include all aspects of work including but not limited to: removal of existing failed culvert(s), furnish and install 11’ x 8’ box culverts at the each location, and all associated material, equipment, labor, maintenance of traffic, mobilization, erosion control, clearing and grubbing, excavation, dewatering, demolition, de-mucking, disposal of unusable materials, new fill, base rock under pipe and roadway, compaction of fill, stabilization, testing, restoration of road including pavement installation, procurement and installation of selected structures, utility conflict coordination and relocations, final clean up, sodding of disturbed areas, temporary and final thermoplastic striping, as-built plans, permits and permit notification of start and closure as applicable as per the provided construction plans and specifications provided. No additional compensation shall be provided for the work specified in the plans scope and specification provided therein. All work specified in the plans, scope, and specifications shall be cost out with the line items provided.
10% BID BOND
E-Bidding

120 Malabar Road Palm Bay, FL 32907Location

Address: 120 Malabar Road Palm Bay, FL 32907

Country : United StatesState : Florida

You may also like

Willow Ave and Alhambra Ave Drainage Improvements

Due: 15 May, 2024 (in 12 days)Agency: Seminole County

CULVERT PIPE REPLACEMENT - ROCKABYE AT C-41-R

Due: 04 Jun, 2024 (in 1 month)Agency: City of Palm Bay

CULVERT PIPE REPLACEMENT - ROCKABYE AT C-41-R

Due: 04 Jun, 2024 (in 1 month)Agency: City of Palm Bay

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.