Work contemplated to be performed under this contract is as follows: • Constructing approximately 13,900 LF of ductile iron water mains, • Constructing approximately 1,300 LF of earthquake resistant ductile iron pipe water mains, • Constructing approximately 1,100 LF of HDPE water mains, • Installing new fire hydrant assemblies, • Installing replacement water services, • Constructing a replacement Pressure Reducing Station in a concrete vault, • Rehabilitate existing Pressure Reducing Station, • Construction dewatering, • Relocating existing utilities (as required), • Abandoning asbestos cement pipe, • Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, • Performing traffic control • Other work as required to complete the project. The Engineer's Estimate range is between $8.76M and $10.7M. Please see the plans and specifications for more detail. Please see Addendum #1 for more