started - 29 Jul, 2022 (21 months ago)

Start Date

29 Jul, 2022 (21 months ago)
due - 09 Aug, 2022 (20 months ago)

Due Date

09 Aug, 2022 (20 months ago)
Bid Notification

Type

Bid Notification
N40084-22-B-8003

Identifier

N40084-22-B-8003
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (709210)DEPT OF THE NAVY (156995)NAVFAC (10916)NAVFAC PACIFIC CMD (3912)NAVFAC FAR EAST (1149)NAVAL FAC ENGINEERING CMD FAR EAST (1070)

Attachments (13)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

29 July 2022Amendment 0006 is hereby issued.  The purpose of this amendment is to provide government responses. See document N40084-22-B-8003 0006 and attachments for additional details.***********************************************************27 July 2022Amendment 0005 is hereby issued.  The purpose of this amendment is to provide government responses and extend bid submission due date. See document N40084-22-B-8003 0005 and attachments for additional details.***********************************************************26 July 2022Amendment 0004 is hereby issued.  The purpose of this amendment is to provide final design spec and drawings, and the environmental report.  See document N40084-22-B-8003 0004 and attachments 1,2, and 5 for more details.***********************************************************22 July 2022Amendment 0003 is hereby issued.  The purpose of this amendment is to provide Q&A for the solicitation and four (4) attachments for Question #7, #11, #12 and #15.  See
document N40084-22-B-8003 0003 for more information.***********************************************************12 July 2022Amendment 0002 is hereby issued.  This amendment schedules a second site visit and extends the bid submission due date.  See document N40084-22-B-8003 0002 for more information.***********************************************************27 June 2022Amendment 0001 is hereby issued.  This amendment corrects a typo on site visit information.  See document N40084-22-B-8003 0001 for more information. ***********************************************************This project will include the provision of new DDC System at six (6) facilities at Naval Air Facility Atsugi, Japan with BACNet open protocol and an open license to be maintained by the installation. These facilities were selected based on analysis oftheir annual energy consumption, square footage, and potential savings from DDC, and distance to planned network backbone. For all six facilities, the DDC will provide sufficient points to monitor and control all Heating Ventilation and Air Conditioning(HVAC) chillers, fan coils, air handling units, potable hot water systems, variable air volume systems, direct expansion cooling, reheat boxes, package rooftop units, variable refrigerant flow (VRF) systems, computer room air conditioning, heat pumps, outdoor air units, boiler pumps, and package units currently installed in the facilities.This project will provide an FRCS telecom cabinet rack to be installed inside the telecommunications room or an approved location for each of the six (6) DDC buildings. Also, provide DoD approved network equipment and cabling from DDC HVAC control system to base fiber optic connection location within the building. Provide OSP fiber optic cable. The DDC system network infrastructure must be integrated or connected to the Control System Platform Enclave (CSPE). Then, the monitoring and control will be done at the Far East Facility Energy Operations Center (FEOC), CFA Yokosuka. The demarcation point for this project is to establishthe connectivity to the CSPE, however, the integration work at the Central DDC Server located at Far East Facility Energy Operations Center (FEOC), CFA Yokosuka will be established by the Government. A DDC server is not required to be provided at the ICS work desk in PW UEM Office. The six (6) buildings will be monitored at the Far East Facility Energy Operations Center (FEOC) at CFA Yokosuka in the future. Provide DoD approved network equipment and cabling to be integrated or connected to the SCADA server network switch to be connected to the CSPE. Provide RMF requirements into the construction bid package for the SCADA system. The integration of Advanced Metering Infrastructure System is not part of the Scope of Work of this project as discussed during the project kick-off meeting and confirmed by the Smart Grid Program Manager.In accordance with DFARS 236.204, the magnitude of this construction project is estimated between Y100,000,000/$1,000,000 and Y500,000,000/$5,000,000.Class J&A for Facilities Related Control Systems (FRCS) Johnson Controls Incorporated added in accordance with FAR 5.102(a)(6).

PSC 473  BOX 13  FPO , AP 96349-0013  USALocation

Place Of Performance : N/A

Country : United States

Classification

naicsCode 236220Commercial and Institutional Building Construction
pscCode Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS