Replace the SLC 500 DX-1000 transmitter control system and DH+ communication network for the Thailand Transmitting Station at Rasom (USAGM/TTS)

expired opportunity(Expired)
From: Federal Government(Federal)
951700-21-R-0027

Basic Details

started - 23 Aug, 2021 (about 2 years ago)

Start Date

23 Aug, 2021 (about 2 years ago)
due - 27 Aug, 2021 (about 2 years ago)

Due Date

27 Aug, 2021 (about 2 years ago)
Bid Notification

Type

Bid Notification
951700-21-R-0027

Identifier

951700-21-R-0027
UNITED STATES AGENCY FOR GLOBAL MEDIA, BBG

Customer / Agency

UNITED STATES AGENCY FOR GLOBAL MEDIA, BBG (224)UNITED STATES AGENCY FOR GLOBAL MEDIA, BBG (224)OFFICE OF CONTRACTS (173)

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The U.S. Agency for Global Media, Thailand Transmitting Station at Rasom (USAGM/TTS) to replace the SLC 500 DX-1000 transmitter control system and DH+ communication network. Work is to be performed at the U.S. Agency for Global Media Transmitting station site at Rasom, Ayutthaya Province, Thailand. The contract type shall be firm-fixed price.The Bangkok Transmission Stations DX-1000 Harris transmitter is equipped with SLC 500 control system and DH+ communication network.  The current SLC 5/04 and SLC 5/01 ladder program, HD+ communication network, MMI, and Allen-Bradley software technology are outdated, representing challenges locating hardware spare parts and software maintenance. The desired DX-1000 transmitter controller system is Allen-Bradley CompactLogix control system and Ethernet communication network platform.This SOW is to provide the requirements for a contractor to survey the site, to provide a replacement design, and then to replace new DX-1000 transmitter controller system. Potential Offerors will be permitted to visit the site to gather all information necessary to provide a cost proposal for the replacement design and implementation. Each offeror must provide a project proposal that includes a design layout, panel layout, schematic and block diagram for the work planned, details of the equipment proposed for installation, a narrative in English of 300 or more words describing their proposed work, and a detailed cost proposal to provide a full engineering design and to then implement the design. The narrative must detail the contractors plan to minimize down time for existing transmitter controller system during the work and a plan to keep the existing system daily broadcasting requirements of the BAK-01 transmitter system during replacement until the new system is properly

330 INDEPENDENCE AVENUE, SW  WASHINGTON , DC 20237  USALocation

Place Of Performance : 330 INDEPENDENCE AVENUE, SW WASHINGTON , DC 20237 USA

Country : United StatesState : District of Columbia

Classification

naicsCode 541519Other Computer Related Services
pscCode DB10IT AND TELECOM - COMPUTE AS A SERVICE: MAINFRAME/SERVERS