From: Federal Government(Federal)
Basic Details | Start Date11 Jan, 2023 (15 months ago)Due Date26 Jan, 2023 (15 months ago) |
Customer / Agency | |
Attachments (1) | |
The contractor is to provide all labor, equipment, supervision, transportation, supplies, and incidentals (except Government-provided sources) to perform all the work consisting of replacing eight (8) concrete vault toilets at seven different locations with an optional item of two additional toilets. The project is located at various locations across the Helena-Lewis and Clark National Forest. Work shall include demolition/removal of an existing toilet and installation of new vault toilet. All work shall be in accordance with the supplied drawings, specifications and bid schedule. This project is for the installation of eight (8) single concrete vault toilets at seven (7) different sites:Summit Campground: Remove two existing toilets and Install two new vault toilets.Timber Creek: Remove existing toilet and Install new vault toilet.Sheep Creek Fishing Access: Remove existing toilet and Install new vault toilet.Bar Gulch Cabin: Remove existing toilet and Install new vault toilet.Eagle Guard Station: Remove existing toilet and Install new vault toilet.Hunters Gulch: Remove existing toilet and Install new vault toilet.GAOA BID ITEMS: GAOA work includes installation of one (1) single concrete vault toilets at one (1) site:Forest Lake Cabin (GAOA): Remove existing toilet and Install new vault toilet.ADDITIVE BID ITEMS: Additive work includes the installation of two (2) single concrete vault toilets at two (2) different sites:Home Gulch Boat Launch: Remove existing toilet and Install new vault toilet.Park Lake Campground Entrance: Remove existing toilet and Install new vault