FORMAL-CSP WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL

From: Houston Authority(Port)
00003148

Basic Details

started - 14 Mar, 2024 (1 month ago)

Start Date

14 Mar, 2024 (1 month ago)
due - 01 May, 2024 (Tomorrow)

Due Date

01 May, 2024 (Tomorrow)
Bid Notification

Type

Bid Notification
00003148

Identifier

00003148
Port of Houston Authority

Customer / Agency

Port of Houston Authority
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Bid Solicitation: 00003148 Header InformationBid Number: 00003148 Description: FORMAL-CSP WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL Bid Opening Date: 05/01/2024 11:00:00 AM Purchaser: Tanika Chukwumerije Organization: Port of Houston Authority Department: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Location: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Fiscal Year: 24 Type Code: CP - CSP - Competitive Sealed Proposal Allow Electronic Quote: No Alternate Id: Required Date: 03/14/2024 Available Date : 03/14/2024 12:12:12 PMInfo Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Pre-proposal meeting will be held via Teams on March 21, 2024 at 9:00 AM and the site visit will be on March 28, 2024 at 2:00 PM meeting in the executive office building in the lunchroom at the Turning Basin Terminal. Bulletin Desc: This project consists of the installation of approx. 9500 linear feet of new 8-inch waterlines, 460 linear feet of new 6-inch
waterlines, valves, hydrants and other appurtenances at south Turning Basin Terminal to support operations at Wharves 1-4 and Wharves 41-48. Ship-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Bill-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Print Format: Bid Print File Attachments: TERMS AND CONDITIONS .pdf CSP-3148 Rehab of Waterlines STBT.pdf ADDENDUM NO. 1 ADDENDUM NO. 2 PRE-PROPOSAL MEETING INSTRUCTIONS Addendum No. 3 Site Visit Sign in Sheet ADDENDUM NO. 4 ADDENDUM NO. 5 BID OPENING INSTRUCTIONS ADDENDUM NO. 6 ADDENDUM NO. 7 Form Attachments: Legal Contract: Contract Required Amendments: Amendment #Amendment DateAmendment Note 1 03/18/2024 07:10:05 AM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 2 03/18/2024 01:48:44 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added . 3 03/18/2024 06:50:22 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added . 4 03/21/2024 08:54:36 AM Administrative Addendum. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' deleted . 2. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 5 04/03/2024 03:13:17 PM Include the 1 page signed addendum acknowledgement with the emailed proposal response. Attachment File Changes: Header 1. File 'Addendum No. 3': File 'Addendum No. 3' added . 6 04/08/2024 01:14:15 PM Administrative Addendum. No signed addendum acknowledgment is required. Attachment File Changes: Header 1. File 'Site Visit Sign in Sheet': File 'Site Visit Sign in Sheet' added . 7 04/16/2024 03:02:14 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/17/2024 11:00:00 AM" to "04/24/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added . 8 04/23/2024 10:15:20 AM Administrative addendum. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 9 04/23/2024 12:04:47 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/24/2024 11:00:00 AM" to "05/01/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' deleted . 2. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added . 10 04/23/2024 02:03:39 PM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 11 04/25/2024 01:25:12 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 6': File 'ADDENDUM NO. 6' added . 12 04/25/2024 05:06:00 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 7': File 'ADDENDUM NO. 7' added . Item Information 1-5 of 11 1 2 3 function viewItemPage(pageNum) { document.forms[0].action = "/bso/external/bidDetail.sdo"; setWaitCursor(); document.forms[0].mode.value="navigation"; document.forms[0].currentPage.value=pageNum; document.forms[0].submit(); } Item # 1: ( 912 - 00 ) FILE NO.: 2024-0037 MINUTE NO.: _______ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY FOR THE WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL. ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE. NIGP Code: 912-00 CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 912 - 40 ) SUBSEQUENT NIGP CODE NIGP Code: 912-40 Demolition Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 912 - 16 ) SUBSEQUENTY NIGP CODE NIGP Code: 912-16 Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 912 - 44 ) SUBSEQUENT NIGP CODE NIGP Code: 912-44 Excavation Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 00 ) SUBSEQENT NIGP CODE NIGP Code: 913-00 CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: 1-5 of 11 1 2 3 Copyright © 2024 Periscope Holdings, Inc. - All Rights Reserved. default Bid Solicitation: 00003148 Header InformationBid Number: 00003148 Description: FORMAL-CSP WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL Bid Opening Date: 05/01/2024 11:00:00 AM Purchaser: Tanika Chukwumerije Organization: Port of Houston Authority Department: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Location: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Fiscal Year: 24 Type Code: CP - CSP - Competitive Sealed Proposal Allow Electronic Quote: No Alternate Id: Required Date: 03/14/2024 Available Date : 03/14/2024 12:12:12 PMInfo Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Pre-proposal meeting will be held via Teams on March 21, 2024 at 9:00 AM and the site visit will be on March 28, 2024 at 2:00 PM meeting in the executive office building in the lunchroom at the Turning Basin Terminal. Bulletin Desc: This project consists of the installation of approx. 9500 linear feet of new 8-inch waterlines, 460 linear feet of new 6-inch waterlines, valves, hydrants and other appurtenances at south Turning Basin Terminal to support operations at Wharves 1-4 and Wharves 41-48. Ship-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Bill-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Print Format: Bid Print File Attachments: TERMS AND CONDITIONS .pdf CSP-3148 Rehab of Waterlines STBT.pdf ADDENDUM NO. 1 ADDENDUM NO. 2 PRE-PROPOSAL MEETING INSTRUCTIONS Addendum No. 3 Site Visit Sign in Sheet ADDENDUM NO. 4 ADDENDUM NO. 5 BID OPENING INSTRUCTIONS ADDENDUM NO. 6 ADDENDUM NO. 7 Form Attachments: Legal Contract: Contract Required Amendments: Amendment #Amendment DateAmendment Note 1 03/18/2024 07:10:05 AM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 2 03/18/2024 01:48:44 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added . 3 03/18/2024 06:50:22 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added . 4 03/21/2024 08:54:36 AM Administrative Addendum. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' deleted . 2. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 5 04/03/2024 03:13:17 PM Include the 1 page signed addendum acknowledgement with the emailed proposal response. Attachment File Changes: Header 1. File 'Addendum No. 3': File 'Addendum No. 3' added . 6 04/08/2024 01:14:15 PM Administrative Addendum. No signed addendum acknowledgment is required. Attachment File Changes: Header 1. File 'Site Visit Sign in Sheet': File 'Site Visit Sign in Sheet' added . 7 04/16/2024 03:02:14 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/17/2024 11:00:00 AM" to "04/24/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added . 8 04/23/2024 10:15:20 AM Administrative addendum. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 9 04/23/2024 12:04:47 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/24/2024 11:00:00 AM" to "05/01/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' deleted . 2. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added . 10 04/23/2024 02:03:39 PM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 11 04/25/2024 01:25:12 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 6': File 'ADDENDUM NO. 6' added . 12 04/25/2024 05:06:00 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 7': File 'ADDENDUM NO. 7' added . Item Information 1-5 of 11 1 2 3 function viewItemPage(pageNum) { document.forms[0].action = "/bso/external/bidDetail.sdo"; setWaitCursor(); document.forms[0].mode.value="navigation"; document.forms[0].currentPage.value=pageNum; document.forms[0].submit(); } Item # 1: ( 912 - 00 ) FILE NO.: 2024-0037 MINUTE NO.: _______ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY FOR THE WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL. ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE. NIGP Code: 912-00 CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 912 - 40 ) SUBSEQUENT NIGP CODE NIGP Code: 912-40 Demolition Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 912 - 16 ) SUBSEQUENTY NIGP CODE NIGP Code: 912-16 Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 912 - 44 ) SUBSEQUENT NIGP CODE NIGP Code: 912-44 Excavation Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 00 ) SUBSEQENT NIGP CODE NIGP Code: 913-00 CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: 1-5 of 11 1 2 3 Copyright © 2024 Periscope Holdings, Inc. - All Rights Reserved. default Header InformationBid Number: 00003148 Description: FORMAL-CSP WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL Bid Opening Date: 05/01/2024 11:00:00 AM Purchaser: Tanika Chukwumerije Organization: Port of Houston Authority Department: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Location: 72820 - PROJECT AND CONSTRUCTION MANAGEMENT Fiscal Year: 24 Type Code: CP - CSP - Competitive Sealed Proposal Allow Electronic Quote: No Alternate Id: Required Date: 03/14/2024 Available Date : 03/14/2024 12:12:12 PMInfo Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Pre-proposal meeting will be held via Teams on March 21, 2024 at 9:00 AM and the site visit will be on March 28, 2024 at 2:00 PM meeting in the executive office building in the lunchroom at the Turning Basin Terminal. Bulletin Desc: This project consists of the installation of approx. 9500 linear feet of new 8-inch waterlines, 460 linear feet of new 6-inch waterlines, valves, hydrants and other appurtenances at south Turning Basin Terminal to support operations at Wharves 1-4 and Wharves 41-48. Ship-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Bill-to Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HOUSTON, TX 77029 US Email: pcminvoicing@POHA.COM Phone: (713)670-2523 Print Format: Bid Print File Attachments: TERMS AND CONDITIONS .pdf CSP-3148 Rehab of Waterlines STBT.pdf ADDENDUM NO. 1 ADDENDUM NO. 2 PRE-PROPOSAL MEETING INSTRUCTIONS Addendum No. 3 Site Visit Sign in Sheet ADDENDUM NO. 4 ADDENDUM NO. 5 BID OPENING INSTRUCTIONS ADDENDUM NO. 6 ADDENDUM NO. 7 Form Attachments: Legal Contract: Contract Required Amendments: Amendment #Amendment DateAmendment Note 1 03/18/2024 07:10:05 AM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 2 03/18/2024 01:48:44 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added . 3 03/18/2024 06:50:22 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added . 4 03/21/2024 08:54:36 AM Administrative Addendum. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' deleted . 2. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 5 04/03/2024 03:13:17 PM Include the 1 page signed addendum acknowledgement with the emailed proposal response. Attachment File Changes: Header 1. File 'Addendum No. 3': File 'Addendum No. 3' added . 6 04/08/2024 01:14:15 PM Administrative Addendum. No signed addendum acknowledgment is required. Attachment File Changes: Header 1. File 'Site Visit Sign in Sheet': File 'Site Visit Sign in Sheet' added . 7 04/16/2024 03:02:14 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/17/2024 11:00:00 AM" to "04/24/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added . 8 04/23/2024 10:15:20 AM Administrative addendum. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 9 04/23/2024 12:04:47 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/24/2024 11:00:00 AM" to "05/01/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' deleted . 2. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added . 10 04/23/2024 02:03:39 PM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 11 04/25/2024 01:25:12 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 6': File 'ADDENDUM NO. 6' added . 12 04/25/2024 05:06:00 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 7': File 'ADDENDUM NO. 7' added . Pre Bid Conference: Pre-proposal meeting will be held via Teams on March 21, 2024 at 9:00 AM and the site visit will be on March 28, 2024 at 2:00 PM meeting in the executive office building in the lunchroom at the Turning Basin Terminal. Bulletin Desc: This project consists of the installation of approx. 9500 linear feet of new 8-inch waterlines, 460 linear feet of new 6-inch waterlines, valves, hydrants and other appurtenances at south Turning Basin Terminal to support operations at Wharves 1-4 and Wharves 41-48. Amendment #Amendment DateAmendment Note 1 03/18/2024 07:10:05 AM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 2 03/18/2024 01:48:44 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added . 3 03/18/2024 06:50:22 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added . 4 03/21/2024 08:54:36 AM Administrative Addendum. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' deleted . 2. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added . 5 04/03/2024 03:13:17 PM Include the 1 page signed addendum acknowledgement with the emailed proposal response. Attachment File Changes: Header 1. File 'Addendum No. 3': File 'Addendum No. 3' added . 6 04/08/2024 01:14:15 PM Administrative Addendum. No signed addendum acknowledgment is required. Attachment File Changes: Header 1. File 'Site Visit Sign in Sheet': File 'Site Visit Sign in Sheet' added . 7 04/16/2024 03:02:14 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/17/2024 11:00:00 AM" to "04/24/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added . 8 04/23/2024 10:15:20 AM Administrative addendum. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 9 04/23/2024 12:04:47 PM Include the 2-page signed addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "04/24/2024 11:00:00 AM" to "05/01/2024 11:00:00 AM". Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' deleted . 2. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added . 10 04/23/2024 02:03:39 PM Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'BID OPENING INSTRUCTIONS': File 'BID OPENING INSTRUCTIONS' added . 11 04/25/2024 01:25:12 PM Include the 1-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 6': File 'ADDENDUM NO. 6' added . 12 04/25/2024 05:06:00 PM Include the signed 1-page addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 7': File 'ADDENDUM NO. 7' added . Item Information 1-5 of 11 1 2 3 function viewItemPage(pageNum) { document.forms[0].action = "/bso/external/bidDetail.sdo"; setWaitCursor(); document.forms[0].mode.value="navigation"; document.forms[0].currentPage.value=pageNum; document.forms[0].submit(); } 1-5 of 11 1 2 3 Item # 1: ( 912 - 00 ) FILE NO.: 2024-0037 MINUTE NO.: _______ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY FOR THE WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL. ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE. NIGP Code: 912-00 CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 1: ( 912 - 00 ) FILE NO.: 2024-0037 MINUTE NO.: _______ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY FOR THE WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL. ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE. NIGP Code: 912-00 CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 1: ( 912 - 00 ) FILE NO.: 2024-0037 MINUTE NO.: _______ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY FOR THE WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL. ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE. NIGP Code: 912-00 CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 912 - 40 ) SUBSEQUENT NIGP CODE NIGP Code: 912-40 Demolition Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 912 - 40 ) SUBSEQUENT NIGP CODE NIGP Code: 912-40 Demolition Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 912 - 40 ) SUBSEQUENT NIGP CODE NIGP Code: 912-40 Demolition Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 912 - 16 ) SUBSEQUENTY NIGP CODE NIGP Code: 912-16 Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 912 - 16 ) SUBSEQUENTY NIGP CODE NIGP Code: 912-16 Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 912 - 16 ) SUBSEQUENTY NIGP CODE NIGP Code: 912-16 Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 912 - 44 ) SUBSEQUENT NIGP CODE NIGP Code: 912-44 Excavation Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 912 - 44 ) SUBSEQUENT NIGP CODE NIGP Code: 912-44 Excavation Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 912 - 44 ) SUBSEQUENT NIGP CODE NIGP Code: 912-44 Excavation Services QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 00 ) SUBSEQENT NIGP CODE NIGP Code: 913-00 CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: 1-5 of 11 1 2 3 Item # 5: ( 913 - 00 ) SUBSEQENT NIGP CODE NIGP Code: 913-00 CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 5: ( 913 - 00 ) SUBSEQENT NIGP CODE NIGP Code: 913-00 CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: QtyUnit CostUOMTax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Manufacturer: Brand: Model: Make: Packaging: 1-5 of 11 1 2 3

Roger H. Hoh
111 EAST LOOP NORTH (exit 29)
HOLocation

Address: Roger H. Hoh 111 EAST LOOP NORTH (exit 29) HO

Country : United StatesState : Texas

You may also like

FORMAL-CSP WATERLINE REHABILITATION AT SOUTH TURNING BASIN TERMINAL

Due: 01 May, 2024 (Tomorrow)Agency: Port of Houston Authority

330 King Street Waterline Replacement and Parking Lot Expansion

Due: 30 Apr, 2024 (Today)Agency: Northumberland County

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

912-00,912-40,912-16,912-44,913-00