Added: Jun 06, 2018 8:37 pm The Contractor shall provide all labor, tools, equipment, materials and supervision to perform the work indicated in this Performance Work Statement (PWS). The tasks provided under this contract consist of the tasks listed. The Contractor shall provide all ancillary tasks and materials necessary to provide a complete, useable space.
2.1 Background: The Veteran required the use of several therapeutic modalities in reducing his chronic pain to a level enhancing his overall sense of health, well-being, and comfort. One of those modalities is the use of immersive hydrotherapy. This requires obtainment and installation of a hydrotherapy tub in his main bathroom. The intent of this construction project is to allow the Veteran the ability to utilize immersive hydrotherapy treatment interventions on a personal as-needed home-based basis, which is viewed as most therapeutic to his needs.
2.2 General Construction Activities: This project involves the removal and replacement of an existing typical bathtub in the Veteran s home with an immersive hydrotherapy tub. This main bathroom is on the second story of the home. The successful installation of the new tub will require the performing contractor to pay special detail in minimizing disturbance to the Veteran s home. The size of the selected bathtub will directly contribute to this effort and to the scope of this construction
Location
Address: SEE SOLICITATION FOR DETAILS;Waipahu, Hawaii 96797 USA