In general, the work consists of: site preparation, erosion control, site clearing, stripping of topsoil, rough grading, creation of an OLRA area with a rice stone play surface set on a drain gravel base, 4 inch black vinyl coated chain link fence, benches, bike rack, trash receptacles and other site improvements, an ADA compliant bituminous concrete path system connecting all proposed elements; connection to existing water line in street to service a water fountain element, extension or water supply from existing soccer fields well, irrigation system, drainage, 16 inch metal gazebo shelter on a concrete