The work consists generally of construction including: storm drain cleaning, inspection, CCTV, repairing and grouting of voids, point repairs, grouting of existing flow line, cured in place piping lining, storm drain structure floor repairs, post CCTV and inspection, overall rehabilitation of existing corrugated metal pipe storm drain systems, and compliance to all applicable storm water pollution prevention (NPDES)