Interstate 15/Nichols Road Interchange Improvement Project

expired opportunity(Expired)
From: City of Lake Elsinore(City)
Z10082

Basic Details

started - 18 Aug, 2022 (20 months ago)

Start Date

18 Aug, 2022 (20 months ago)
due - 29 Sep, 2022 (19 months ago)

Due Date

29 Sep, 2022 (19 months ago)
Bid Notification

Type

Bid Notification
Z10082

Identifier

Z10082
Engineering Department

Customer / Agency

Engineering Department
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project Title Interstate 15/Nichols Road Interchange Improvement Project Invitation # Z10082 Bid Posting Date 08/18/2022 4:20 PM (PDT) Project Stage Bidding Bid Due Date 09/29/2022 2:00 PM (PDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Cost File Response File MISC Type of Award Lump Sum Categories 92500 - Engineering Services, Professional 91842 - Engineering Consulting License Requirements Restriction eBidding Restricted To Must meet one of the following restrictions: NONE - Classifications Not Applicable Or be in one of the following groups: Plan Rooms Department Engineering Department Address 130 S. Main Street Lake Elsinore, California County Riverside Bid Valid Liquidated Damages Estimated Bid Value Start/Delivery Date November 2022 Project Duration Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting Information Pre-Bid Meeting No Online Q&A Online Q&A Yes Q&A Deadline 09/15/2022 2:00 PM (PDT) Contact
Information Contact Info Nicole McCalmont 951-674-3124 x245 nmccalmont@lake-elsinore.org Bids to PlanetBids Owner's Agent City of Lake Elsinore Description Scope of Services The Consultant shall perform all work necessary to define the project, produce all necessary documents required to obtain approval of the Project Study Report – Project Development Support (PSR-PDS) per the latest edition of the Caltrans Project Development Procedures Manual (PDPM), Appendix S, “Preparation Guidelines for Project Study Report-Project Development Support Initiation Document”. The Consultant shall be responsible for the preparation, submittal, and approval of all accompanying documents. Other Details The Interstate 15 Nichols Road interchange (Interchange) is located between the Lake Street and Central Avenue (State Route 74) Interchanges in Lake Elsinore, CA (see Figure 1). Nichols Road is designated as an Urban Arterial Highway (6 lanes) per the City’s General Plan Transportation Element. The Interchange is currently a diamond configuration that will serve as a major access point for existing and future industrial and residential development at properties west of the freeway and residential and commercial properties east of the freeway. The Nichols Road ramps and the adjacent local intersections and driveways within the project area are controlled by stop signs. The Interchange is also within very close proximity to local intersections and driveways that would need to be included in the study and scope of this project. Future peak hour volumes are anticipated to cause congestion and delays at the Interchange as well as local roadway segments and intersections. The purpose of the proposed project would be to relieve congestion by improving traffic operation and reduce congestion in the vicinity of Interstate 15-Nichols Road on- and off-ramps, local road segments, and intersections. The improvements would also have to accommodate the projected 2050 traffic flow at ramp intersections and the regional transportation system. In order to accomplish this objective, the City of Lake Elsinore, in cooperation with Caltrans is initiating the PSR-PDS phase. Notes Special Notices Local Programs & Policies Place eBid

130 S. Main Street Lake Elsinore, CaliforniaLocation

Address: 130 S. Main Street Lake Elsinore, California

Country : United StatesState : California

You may also like

JUNEAU FEDERAL BUILDING FY24 IMPROVEMENT PROJECTS

Due: 31 Oct, 2024 (in 6 months)Agency: PUBLIC BUILDINGS SERVICE

IFB 2024-2127 Deerfield North Main St. Sidewalk Improvement Project

Due: 07 May, 2024 (in 10 days)Agency: Franklin Regional Council of Governments

IFB 23-01-468 Red Line BRT. Traffic Control Modification Construction Project

Due: 01 Jul, 2024 (in 2 months)Agency: Indianapolis Public Transportation Corporation

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.