This requirement was previously solicited under solicitation number FA462522Q1011, an updated SOW has been updloaded with highlighted areas showing the updated sections.The purpose of this effort is to establish an IT solution for the ACS system in bldg 38 on Whiteman AFB, MO. This is a two part requirement. The first part is to install six antennas onto the building's roof, and wire four of them to the building's installed fiber via a FORAX AIU system (already on site) on the roof. The other two antennas will need to be wired to a room on the 1st floor, and the wiring for this will need to be run and installed. The second part is to wire a communication and data gateway in the second floor of the building. This will support operations between rooms within a SCIF through the use of a FORAX RIU system (already on site). The communication portion will utilize a set of Harris AN‐PRC‐117G radios. UPDATE 10 August 2022 UPDATEFA462522Q1011 Amendment 1- Questions and Answers from 5 August Update PostedAmmendment #1/Attachment #1-1. COB Maddog Cab Details (in reference to question 3)Ammendment #1/Attachment #2- 2. Link 16 CutsheetAmmendment #1/Attachment #3- 3. UHF SATCOM CutsheetAmmendment #1/Attachment #4- 4. Configuration for 10-Link SystemAmmendment #1/Attachment #5- 5. FW COB ACS Integration (in reference to question 6)Ammendment #1/Attachment #6 -6. Gateway apparatus solutionAmmendment #1/Attachment #7 -7 Questions and AnswersUPDATE 10 August 2022 UPDATEUPDATE 12 August 2022 UPDATEUpdated responses dueUPDATE 12 August 2022