East of Hills System Study Project - Tunnel Alignment Studies

expired opportunity(Expired)
From: East Bay Municipal Utility District(Utilities)
East of Hills

Basic Details

started - 28 Jan, 2020 (about 4 years ago)

Start Date

28 Jan, 2020 (about 4 years ago)
due - 10 Feb, 2020 (about 4 years ago)

Due Date

10 Feb, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
East of Hills

Identifier

East of Hills
East Bay Municipal Utility District

Customer / Agency

East Bay Municipal Utility District
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

EBMUD is soliciting proposals for the East of Hills System Study Project. A consultant will prepare a conceptual planning level study for two tunnels; one from Walnut Creek Water Treatment Plant (WTP) to Lafayette WTP and the other from Orinda WTP to Lafayette WTP. The scope of work will include the following tasks: Review existing geotechnical data, develop a geologic model and prepare 2D visualizations Develop the horizontal and vertical tunnel alignment alternatives and portal/shaft locations to convey treated water from Walnut Creek Water Treatment Plant to Lafayette Water Treatment Plant, and Orinda Water Treatment Plant to Lafayette Water Treatment Plant Scope the design phase for the tunnel Prepare a conceptual cost estimate for design and construction phases Geotechnical explorations (optional) Additional alignment alternatives (optional) Please respond to this RFP no later than 4:00 p.m. on Monday, February 10, 2020. Proposers are to submit one (1) original hardcopy RFP
response (Exhibit A – RFP Response Packet, including Contract Equity Program forms and all additional documentation stated in the “Required Documentation and Submittals” section of Exhibit A), all with original ink signatures. Six additional hardcopies of the RFP response will be provided.  Proposers must also submit an electronic copy of their RFP response, with their hardcopy RFP response Package. The file must be on a disk or USB flash drive and enclosed with the sealed original hardcopy of the RFP response. The electronic copy should be in a single file (PDF) format, and shall be an exact copy of the original hard copy Exhibit A – RFP Response Packet, Contract Equity Program forms and all additional documentation stated in the “Required Documentation and Submittals” section of Exhibit A. Completed proposals should be mailed or delivered to: Mail:Hand Delivered/Fed Ex: Winnie Jiang, Junior Engineer East Bay Municipal Utility District  East of Hills System Study Project - Tunnel Alignment Studies  EBMUD, Water Distribution Planning Division (M/S 701) P.O. Box 24055 Oakland, CA 94623 (Postmarks will not be accepted) Winnie Jiang, Junior Engineer  East Bay Municipal Utility District  East of Hills System Study Project - Tunnel Alignment Studies EBMUD, Water Distribution Planning Division (M/S 701) 375 Eleventh Street, 7th Floor Oakland, CA 94607 Questions If you have questions regarding this RFP, please contact Winnie Jiang, Junior Engineer at 510-287-1064 or Winnie.Jiang@ebmud.com. To ensure a response, questions must be received no later than 2:00 p.m. on February 3, 2020. RFP document(s) DocumentTypeSize RFP for East of Hills System Study Project - Tunnel Alignment Studies PDF3.5 MB Addendum 1 - issued December 24, 2019 PDF1.7 MB Addendum 2 - issued January 8, 2020 PDF<1 MB Addendum 3 - issued January 14, 2020 PDF<1 MB Responses to Questions - January 16, 2020 PDF<1 MB Information Meeting Sign-In Sheet - January 9, 2020 PDF1.0 MB References DocumentTypeSize EBMUD Water Treatment and Transmission Improvements Program - Draft Environmental Impact Report June 2006, Volume 1 of 3 PDF85.7 MB EBMUD Water Treatment and Transmission Improvements Program - Draft Environmental Impact Report June 2006, Volume 2 of 3 PDF36.0 MB EBMUD Water Treatment and Transmission Improvements Program - Draft Environmental Impact Report June 2006, Volume 3 of 3 PDF19.0 MB EBMUD Water Treatment and Transmission Improvements Program - Final Environmental Impact Report November 2006 PDF42.3 MB

375 Eleventh Street, First Floor, Oakland, CA 94607-4240Location

Address: 375 Eleventh Street, First Floor, Oakland, CA 94607-4240

Country : United StatesState : California

You may also like

C1DA--CBOC Renovation Brooksville VAMC Architect / Engineer Services (VA-22-00081701)

Due: 11 Jul, 2024 (in 2 months)Agency: VETERANS AFFAIRS, DEPARTMENT OF

Inspection of Fire Protection Systems

Due: 22 Apr, 2024 (in 6 days)Agency: DEPT OF DEFENSE

Capital Planning Study and School Feasibility Study

Due: 30 Apr, 2024 (in 14 days)Agency: Ontario First Nations Technical Services Corporation

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.