"Nen Hampshire\n\nDepartment of Transportation\n\nInformation Report\n\nKEENE - SWANZEY\n\n40100\nX-A004(345)\n\nCounty:\nDate Bids Open:\n\nScope of Work:\n\nCHESHIRE\n2/2/2023\n\nConstruction of floodplain and wetland mitigation for the Keene-Swanzey series of\n\nprojects\n\nLocation: NH 9/10/12/101\n\nCompletion Date: 5/31/2024\n\nProposal Guarantee: 5% of bid amount\n\nItem Item Estimated\nNumber Description Unit Quantity\nKEENE - SWANZEY 40100\nFloodplain Mitigation\n201.1 CLEARING AND GRUBBING (F) A 3.00\n201.881 INVASIVE SPECIES CONTROL TYPE | SY 5,600.00\n203.1 COMMON EXCAVATION CY 37,500.00\n203.11 COMMON EXCAVATION - LRS CY 900.00\n214. FINE GRADING U 1.00\n503.201 COFFERDAMS U 1.00\n503.202 COFFERDAMS U 1.00\n503.203 COFFERDAMS U 1.00\n603.99042 42\" TEMPORARY DRAINAGE PIPE LF 200.00\n615.024 RELOCATING TRAFFIC SIGN TYPE B U 2.00\n615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2.00\n615.054 RELOCATING TRAFFIC SIGN TYPE BB U 2.00\n615.064 RELOCATING TRAFFIC SIGN TYPE CC U
2.00\n618.61 UNIFORMED OFFICGERS WITH VEHICLE $ 31,000.00\n618.7 FLAGGERS HR 1,600.00\nMonday, January 09, 2023 Page 10f2\n" "619.1 MAINTENANCE OF TRAFFIC U 1.00\n619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 4.00\n645.512 COMPOST SOCK FOR PERIMETER BERM LF 1,600.00\n645.531 SILT FENCE LF 2,750.00\n645.611 BONDED FIBER MATRIX (BFM) LB 23,940.00\n645.7 STORM WATER POLLUTION PREVENTION PLAN U 1.00\n645.71 MONITORING SWPPP AND EROSION AND SEDIMENT HR 240.00\nCONTROLS\n646.2 TURF ESTABLISHMENT WITHOUT MULCH A 5,566.05\n647.1 HUMUS CY 3,640.00\n650.2 LANDSCAPING U 1.00\n662.282 DECOMMISSION MONITORING WELL LF 80.00\n670.0491 CONSTRUCT AND REMOVE TEMPORARY ACCESS U 1.00\nROAD\n670.95 TEMPORARY SAFETY FENCE LF 1,000.00\n692. MOBILIZATION U 1.00\n697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1.00\n697.31 PROJECT OPERATIONS PLAN U 1.00\n698.12 FIELD OFFICE TYPE B MON 15.00\n699. MISCELLANEOUS TEMPORARY EROSION AND $ 12,500.00\nSEDIMENT CONTROL\n1010.15 FUEL ADJUSTMENT $ 25,000.00\nMonday, January 09, 2023 Page 2 0f2\n"