Hardware for Beam Size Monitor Beamline

expired opportunity(Expired)
From: Federal Government(Federal)
2-B170-P-00350-00

Basic Details

started - 29 Jul, 2022 (21 months ago)

Start Date

29 Jul, 2022 (21 months ago)
due - 15 Aug, 2022 (20 months ago)

Due Date

15 Aug, 2022 (20 months ago)
Bid Notification

Type

Bid Notification
2-B170-P-00350-00

Identifier

2-B170-P-00350-00
ENERGY, DEPARTMENT OF

Customer / Agency

ENERGY, DEPARTMENT OF (8005)ENERGY, DEPARTMENT OF (8005)ARGONNE NATL LAB - DOE CONTRACTOR (417)

Attachments (17)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Argonne National Laboratory (ANL) is initiating upgrades for the Advanced Photon Source-Upgrade (APS-U) project, including one beam size monitor (BSM) beamline using the A:M1 source for optimal emittance measurements. The beamline has two relative beam size monitors (RBSM) for fast emittance/energy-spread measurements, one for the horizontal plane and the other for the vertical plane. During the commissioning of the APS-U Storage Ring, the horizontal beam size monitor will also be used to measure Key Performance Parameters (KPP).The APS-U requests the manufacturing of the various components necessary for the BSM beamline. This scope includes the fabrication per drawings (drawings provided by APS-U), Quality Control, Testing, Documentation, delivery/shipment of the components, and the appropriate documentation to APS-U by the key technical, material, quality, and acceptance

Lemont ,
 IL  60439  USALocation

Place Of Performance : N/A

Country : United StatesState : IllinoisCity : Lemont

Classification

naicsCode 332312Fabricated Structural Metal Manufacturing
pscCode 6640Laboratory Equipment and Supplies