This bid is being issued to hire a qualified firm to carry out the scope of work as described below: The scope of work for the replacement Tennyson Middle School project is a comprehensive, two-story middle school replacement facility located at 6100 Tennyson Dr. in Waco, Texas. The new building is approximately 180,000 square feet, utilizing tilt wall construction and structural steel for the primary structure. Typical interior environments include classroom neighborhoods, library, gymnasiums, cafeteria and commercial kitchen, administration facilities, athletics support facilities and locker rooms, and performing and fine arts rehearsal and classroom spaces. The building is to be constructed on a roughly 15-acre site and include a new 400 meter 8-lane track with a natural grass field. The new facility will be constructed while the existing Tennyson middle school facility remains operational. Once the new facility is completed, the school will transition into the new facility, and
the existing facility will be demolished to allow for the remainder of the site work to be completed. The Anticipated budget for this project is $ 63,000,000.00 Contact Information: Name Judy Monroe Address 501 Franklin, Suite 401 Waco, TX 76701 Phone (254) 755-9458 Fax (254) 755-9688 Email judy.monroe@wacoisd.org Bid Attachments Addendum # 2 221200_Tennyson MS.pdf This addendum is being issued to provide revisions to the project manual and drawings as well as answer submitted questions.70.01 MB Addendum # 1 10.11.2022pdf.pdf This addendum is being issued to address the follow Revised CSP Pre-Bid Presentation Minutes of Pre-Bid Meeting Agenda Pre-Bid Sign in Sheet289.77 MB CSP # 22-1231 Tennyson Middle School Replacement Project.pdf The scope of work for the replacement Tennyson Middle School project is a comprehensive, two-story middle school replacement facility located at 6100 Tennyson Dr. in Waco, Texas. The new building is approximately 180,000 square feet, utilizing tilt wall construction and structural steel for the primary structure. Typical interior environments include classroom neighborhoods, library, gymnasiums, cafeteria and commercial kitchen, administration facilities, athletics support facilities and locker rooms, and performing and fine arts rehearsal and classroom spaces. The building is to be constructed on a roughly 15-acre site and include a new 400 meter 8-lane track with a natural grass field. The new facility will be constructed while the existing Tennyson middle school facility remains operational. Once the new facility is completed, the school will transition into the new facility, and the existing facility will be demolished to allow for the remainder of the site work to be completed. 287.43 MB 221200_Tennyson MS_Addendum 03_COMBINED.pdf Addendum #3 Documentation including updated bid date and bid form.6.20 MB