WILDWOOD DRIVE BRIDGE OVER BEAVER CREEK postdate:- 14-Mar-2024 6:00:00 AM CDT responsedate:- 11-Apr-2024 2:00:00 PM CDT ( 18h, 45m+ ) description:- The project scope of work is to include the construction of a 24-foot wide x 80-foot long 4-span cast-in-place concrete bridge on Wildwood Drive over Beaver Creek in Livingston Parish. Wildwood Drive is a dead-end road that serves approximately 40 homes. The new bridge will be constructed on a new alignment to allow the existing bridge and roadway to remain open during construction for access to the existing homes. The new bridge and roadway approaches are to be constructed, the traffic is to be shifted to the new bridge and roadway, and the existing bridge and roadway is to be demolished. The construction will also include asphalt concrete pavement, class II crushed stone base course, drainage ditches, drainage pipe, and driveway reconstruction. A NON-MANDATORY PRE-BID CONFERENCE WILL BE HELDat 2:00 PM on March 27th, 2024, at Livingston Parish Government 20399 Government Blvd., Livingston, LA