Project Title PDX Maintenance Facility CNG Fuel Station Compressor Replacement Invitation # 2022-9898 Bid Posting Date 05/24/2022 1:04 PM (PDT) Project Stage Bidding Bid Due Date 06/22/2022 2:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum Categories 90662 - Petroleum and Fuel (Storage an 91430 - Concrete 91438 - Electrical 91468 - Plumbing 67000 - PLUMBING EQUIPMENT, FIXTURES, 69100 - POWER TRANSMISSION EQUIPMENT - 90636 - Gas Systems (Propane, Natural, 21000 - CONCRETE AND METAL CULVERTS, P 28000 - ELECTRICAL CABLES & WIRES 28500 - ELECTRICAL EQUIPMENT AND SUPPL 46000 - HOSE, ACCESSORIES, AND SUPPLIE 65800 - PIPE AND TUBING 65900 - PIPE AND TUBING FITTINGS License Requirements See Project Manual Department Engineering Address 7200 NE Airport Way Portland, Oregon County Multnomah Bid Valid Liquidated Damages See Project Manual Estimated Bid Value Start/Delivery Date See Project Manual Project
Duration See Project Manual Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Information Pre-Bid Meeting Yes - Not Mandatory Pre-Bid Meeting Date 06/02/2022 2:30 PM (PDT) Pre-Bid Meeting Location To attend, bidders must RSVP through the Port’s online bidding system no later than 24 hours before the pre-bid meeting. A Microsoft Teams meeting invite will be sent to all bidders who RSVP. A separate site tour will be held at 3 p.m. on June 8, 2022, at the Portland International Airport Maintenance Facility, 7111 N.E. Alderwood Road, Portland, Oregon. This tour requires an RSVP at least two business days prior to the date of the tour. Online Q&A Online Q&A Yes Q&A Deadline 06/15/2022 5:00 PM (PDT) Contact Information Contact Info Kim Alandar kim.alandar@portofportland.com Bids to Owner's Agent Description Scope of Services Removal of existing CNG compressor. Purchase and Installation of new package CNG compressor with remote electrical panel. Integration of controls with existing CNG fuel dispensing island. Electrical power for new CNG compressor. Natural gas piping for new CNG compressor. Work will need to be scheduled and executed to minimize down time of CNG compressor. Other Details Notes Special Notices Local Programs & Policies Place eBid