CL-FFCP-WP1.1.2 FSF Superstructure & Envelope Pre-qualification Project Description :Purpose of this Pre-Qualification This is NOT a bid solicitation. This is a notice to trade contractors, vendors, and suppliers (herein noted as “Parties”) to pre-qualify for the opportunity to tender this project, and to provide the Parties an opportunity to apply for security clearances. Note there is no guarantee that the project will proceed or that any security clearance(s) will be granted under the sponsorship process in a timley fashion or otherwise. Description of the Project EllisDon Construction Services Inc. (EllisDon) as the Design Builder, along with its design partner, Stantec have been contracted to provide design services and constructability oversight to complete the design of the Royal Canadian Air Force (RCAF) infrastructure that will support the Future Fighter Capability Project (FFCP). The infrastructure will provide shelter and a working environment capable of supporting the
operation and maintenance of a yet to be determined advanced fighter aircraft. Description of the Scope of works Contract Number: 71947 Title: Modified Design Build Services for Fighter Squadron Facility Description: Construction of a new a Fighter Squadron Facility consisting of two fully operational Tactical Fighter Squadrons (TFS) and the Operational Training Unit (OTU), including but not limited to: offices, administrative spaces, mission planning rooms, briefing / de-briefing rooms, meeting rooms, classrooms, auditorium, speciality training rooms including simulators (SIMS) accommodations and Part-Task Trainers accommodations, hangars, maintenance bay facilities, specialty aircraft maintenance labs, shops and storage, IT offices and server rooms, building support spaces, and common spaces. This work package will also include the construction of nearby airfield pavements, apron and taxiway access lane edge lighting, and apron flood lighting consisting of concrete and asphalt. Construction of infrastructure will encompass the following scopes of work. Scope of work, using Masterformat Divisional breakdown as a reference, may include, but are not limited to: Masterformat Division Scope of work 03 11 00 Concrete Formwork 03 15 00 Concrete Accessories 03 20 00 Reinforcing Steel 03 30 00 Concrete Supply 03 35 00 Concrete Placing & Finishing 04 00 00 Masonry 05 10 00 Structural Steel 07 40 00 Metal Roofing, Cladding & Siding 07 50 00 Membrane Roofing 08 40 00 Aluminum Entrances, Storefronts & Curtain Wall 09 21 16 Gypsum Board Assemblies Project Prequalification and Anticipated Security Requirements In order to be eligible to participate in the project prequalification process, the interested party will be required to, among other things, actively hold all required security clearance(s) at the time of closing or have proof that the security clearance application is in process, as will be further detailed in the upcoming Request for Qualifications (RFQ) solicitation/tender documents. As of the date of posting of this Pre-Qualification, the required security clearance(s) are anticipated to be: