Peavine Replacement Campus Prime Consultant Services Project Description :The College has secured funding for the design, installation, and commissioning of the Peavine Campus Replacement “PCR” that has been modelled, conceptually designed, and is required to achieve Net Zero Energy Usage for the proposed campus replacement. The total design, procurement, and construction budget for the Peavine Campus Replacement is approximately $2.65 million dollars. Northern Lakes College has issued this Request for Proposal for the Architecture, Design, Engineering, Contract Administration, and Commissioning for a Peavine Campus Replacement that achieves Net Zero Energy Usage for the proposed campus replacement. Northern Lakes College is inviting firms with demonstrated experience completing commercial Net Zero, sustainable LEED Silver Standard projects in Post-Secondary institution buildings, and that are licensed to practice in the Province of Alberta to respond to this Request for Proposal
(RFP) for Prime and Coordinating Sub-consultant Services. The proposed team should be led by a Prime Consultant, with significant technical expertise and project leadership successfully planning, designing, and executing Net Zero building projects including; Solar PV Systems, Architecture/Design, Civil Engineering, Mechanical/Geothermal Engineering, Electrical Engineering, and Structural Engineering. The College is seeking the following disciplines which may be required to successfully complete this project: Architectural/Design Net Zero Assessment/Energy Modelling Building Code and Permitting Mechanical/Geothermal System Design and Specifications Electrical/Solar PV Systems Design and Specifications Civil Structural The project is to be designed using Building Information Modelling “BIM” LOD 100 (at a minimum) and constructed to LEED Silver Standards. As such, the successful Proponent shall provide services to monitor the design and construction according to plans and specifications, and ensure that LEED Silver Standards shall be achieved and maintained. The LEED Silver standard build does NOT have to be certified BUT the scoresheet of standards must be documented for the owner. The Proponent will also be required to function as the BIM model manager in Revit. The College has provided the NLC Spoke Core Building Template Drawings completed in 2019 for A/S/E/M. The intent of the template drawings is to utilize them as the starting point, and update the AutoCAD A/M/E/S drawings as required to complete the work contemplated in this RFP and achieve Net Zero performance. (AutoCAD drawings will be available to the successful Proponent).