RFP 124-22 Fountain Inn High School Program and Alternates

expired opportunity(Expired)
From: Greenville County Schools(School)
Fountain Inn High School Program and Alternates 06-16-2023

Basic Details

started - 13 Aug, 2023 (8 months ago)

Start Date

13 Aug, 2023 (8 months ago)
due - 20 Sep, 2023 (7 months ago)

Due Date

20 Sep, 2023 (7 months ago)
Bid Notification

Type

Bid Notification
Fountain Inn High School Program and Alternates 06-16-2023

Identifier

Fountain Inn High School Program and Alternates 06-16-2023
Greenville County Schools

Customer / Agency

Greenville County Schools
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

June 16, 2023 NOTES 1000 planned students, grades 9-12 2000 core capacity teach'g total each total each total teach'g total each total each total 1 A. 1. Studio 22 22 22 484 800 17,600 35 35 22 770 800 28000 Phase II was increased to 33 Studios, Increased to 36 studios and deleted Ag Ed 06/14/2023 2. Collaborative Commons 2 3,200 6,400 2 2,853 5706 Includes distributed media (1,780 (main) + 3,926 (lower) 3. Student Toilets 4 350 1,400 4 324 1296 Confirm this meets code required capacity. GCS may consider gender neutral toilets in lieu of group toilet rooms 4. Gender Neutral Toilets 2 60 120 2 50 100 5. Faculty Planning 2 1,600 3,200 2 1,357 2714 6. Conference Room 2 225 450 7. Kitchenette 2 175 350 2 214 428 8. Toilet 4 60 240 4 50 200 22 40 484 29,760 35 51 22 770 38,444 B. 1. AP Chemistry Classroom/Lab. 2 2 22 44 1,400 2,800 2 2 22 44 1478 2956 Deleted from Phase II Program 2. Biology/Physical Science Class/Lab 2 2 22 44 1,400 2,800 Deleted from Phase II Program. Added back into
phase ll program. Built in furniture. 3. Physics Classroom/Lab. 1 1 22 22 1,400 1,400 Deleted from Phase II Program. Added back into phase ll program. Divider in room/no built in furniture/pull down electricity. 4. Science Prep/Storage Room 3 200 600 1 336 336 Deleted from Phase II Program. Added back into phase ll program. 5. Flex Classroom 2 2 22 44 800 1,600 2 2 22 44 800 1600 Include two (2) Flex Lab Spaces at 800 SF (1600 SF with divider – similar to existing) . Cabinet on one wall, cord reels Cabinet with plumbing along one wall Cord reels for distributed power 7 10 154 9,200 4 5 88 4,892 C. 1. Self-Contained Classroom 2 2 12 24 800 1,600 1 1 12 12 902 902 Phase II is reduced to one classroom. Locate on upper floor close to toilet and leave space for a lifting change table 2. Resouce Room 4 350 1,400 4 4 397 1588 Include two (2) Resource Rooms at 400 SF (800 SF with divider) on each floor. 3. Classroom 800 Deleted from Phase II Program 4. Sensory Room 1 294 294 Added to Phase II Program, locate on upper floor 5. Special Ed. Conference Room 250 1 193 193 Shared with Admin Conference Toom 6. Teacher Planning Area 1 300 300 Deleted from Phase II Program 7. Employability Room 1 1 12 12 800 800 8. Special Ed. Life Skills Room 1 1 12 12 1,000 1,000 9. Toilet Room 1 120 120 1 193 193 4 10 48 5,220 5 7 12 3,170 D. 1. Welding Lab 200 Total: Total: Advanced Manufacturing/CATE Special Education Science Fountain Inn High School High School Program Space Chart Greenville, South Carolina SPACE DESCRIPTION Base Program (1,000 student capacity) Additional Program (2,000 student capacity) Total: SPACES STUDENTS NET SQUARE FEET SPACES STUDENTS NET SQUARE FEET STUDENT LEARNING SPACES Studio Clusters (2 Learning Communities) Page 1 of 8 2. Grinding Room 3. Storage/ TBD 4. AM Classroom 1 1 800 800 5. AM Lab 1 1 1 22 22 1,800 1,800 6. Classroom 800 7. AM Storage 1 1 200 200 8. AM Lab 2 1 1 22 22 1,800 1,800 9. AM Classroom 2 1 800 800 10. AM Storage 2 1 400 400 11. AM Lab 3 1 1 22 22 1,800 1,800 12. AM Storage 3 1 13. AM Lab 4 1 1 22 22 1,800 1,800 14. Computer/CAD Classroom 1 1,100 1,100 15. Flex Lab 1 16. Exhibit/Presentation Forum 1 1,000 1,000 17. Shared Faculty Planning 1 250 250 18. Conference Room 1 200 200 19. Kitchenette 1 60 60 20. Toilet/ Changing Room 3 60 180 21. Industry Partner Touchdown Space (AM Office) 1 100 100 22. Greenhouse 0 - 0 - Added to Phase II Program. GCS to confirm size. ADJUSTMENT TO PROGRM 3/15/23. Deleted from Program 06/14/2023 23. AG Biosystems Enginnering Classroom 0 - - - - - Added to Phase II Program, Cabinets alone one wall, eye wash, cord reels Deleted from Program 06/14/2023 24. AG ED Biosystems Lab 0 - - - - - Added to Phase II Program. Cabinets alone one wall, eye wash, cord reels. Roll up door to connect to Greenhouse Deleted from Program 06/14/2023 25. AG Ed Office GCS to confirm if this is needed 3/16/2023. Deleted from Program 06/14/2023 26. Tool Storage - - - ADJUSTMENT TO PROGRAM 3/15/23. Deleted from Program 06/14/2023 27. Future AM/CATE Lab Removed from Phase II Program 28. Future Classroom Removed from Phase II Program 29. Future Storage Removed from Phase II Program 30. Additional Classroom (AM Classroom 3) 1 1 22 22 800 800 31. Maker Lab 2 1 22 44 1,600 1,600 32. Compressed Air 1 115 115 33. Scissor Lift Storage Room 1 115 115 34. Parade Catwalk 2,640 7 23 154 14,920 - 16 - - 40 83 840 59,100 44 79 870 46,506 2 A. 1. Lobby 1 1,000 1,000 2. Waiting 1 500 500 3. Reception/Clerical Space 1 200 200 4. Principal's Office 1 250 250 5. Principal's Toilet/Shower 1 60 60 6. Principal's Conference Room 1 150 150 7. Assistant Principal's Office 1 144 144 Total student learning spaces: ADMINISTRATION AND STAFF SPACES Central Administrative Suite Total: Page 2 of 8 8. School Secretary's Office 1 144 144 9. Bookkeeper's Office 1 144 144 10. Attendance Office 1 144 144 11. Itinerant Office 3 144 432 12. Administrative Conference 1 250 250 13. Administrative Storage 1 120 120 14. Instructional Supply Room 1 150 150 15. Volunteer & PTA Room 1 144 144 16. PTA Storage 1 100 100 17. Clerical Workroom 1 200 200 18. Textbook Storage 1 140 140 19. Staff Restrooms 2 60 120 20. Faculty Workroom/Mailroom 300 21. Resource Officer's Office/Waiting 1 150 150 22. In-School Suspension 400 23. Public (GN) Toilet 2 60 120 25 4,662 B. 1. Assist. Principal Offices 2 200 400 2 145 290 GCS to advise if 3 AP Offices are required. GCS to advise is mental health offices are required 03‐16‐2023 2. AP/Guid. Clerical/Waiting 2 250 500 2 224 448 Consolidate Guidance Spaces into one area of the school 3. Counselor's Offices 6 144 864 4 140 560 Added an additional office to Phase II Program. 9 Counselors Total 4. Flex Room 2 100 200 1 299 299 Phase II program will be used as a conference room 5. Guidance Storage/Student Records (Fire Proof) 2 100 200 1 299 299 Consolidate Guidance Records into one room, locate near guidance conf room, one counselor office, and guidance secretary office 14 2,164 10 1,896 C. 1. Student Government 200 2. School Store 1 630 630 1 630 D. 1. Waiting Area 1 80 80 2. Work Area 1 100 100 3. Office 1 100 100 4. Cot Area 2 80 160 5. Toilet Room 1 60 60 6. Toilet Room w/ Shower/ Changing Table 1 180 180 7 680 33 8,136 10 1,896 3 1. Dining - Phase I 1 6,000 6,000 2. Faculty Dining/Chair Storage 1 650 650 3. Serving Lines, Registers, Queuing 1 1,800 1,800 4. Food Preparation Area 1 1,450 1,450 Total: Total administration and staff spaces: Health Clinic COMMUNITY AND STAKEHOLDER SPACES Total: Total: Student Services Distributed Administration/Student Services Total: Page 3 of 8 5. Dish Drop 1 200 200 6. Dishwashing 1 300 300 7. Pot and Pan Washing Area 1 400 400 8. Dry Food Storage 1 750 750 9. Refrigerator & Freezer 1 750 750 10. Office 1 150 150 11. Locker Room/Restroom 1 120 120 12. Custodial Closet 1 100 100 12 12,670 12 12,670 4 1. Reading Area Media Center 1 2,000 2,000 2. Workroom/Storage 1 300 300 3. Media Production Lab/Digital Storytelling 1 700 700 4. Media Control Room 1 400 400 5. Instructional Coach 2 500 1,000 6. Staff Toilet 1 60 60 7 4,460 7 4,460 5 A. Indoor Spaces 1. Gymnasium w/Circ. & Seating 2 1 40 80 16,000 16,000 2. Auxillary Gym (full size court) 1 1 40 40 6,000 6,000 3. Multi-Purpose Activity/P.E. Lab 1 1 40 40 3,600 3,600 4. Weight Room 1 3,600 3,600 5. Weight Room Toilets 2 60 120 6. Weight Room Office 1 150 150 7. Weight Room Storage 8. Laundry Room & Towel Stor. 1 350 350 9. Uniform Storage 2 300 600 10. Equipment Storage 2 500 1,000 11. Equipment Storage 1 350 350 12. Outdoor P.E. Storage 1 300 300 13. Misc. Storage 2 100 200 14. Training Room/First Aid 1 500 500 15. Sports Medicine/Health Sci/Occ Ther 1 1 22 22 1,200 1,200 Added to Phase II Program, Health Science Thoery Classroom, Lower Level. Three hosputal beds, taping / stretching table. CGS to confirm this is in the program. REMOVED from the program 4- 6. 16. Health Science Lab Added to Phase II Program. CGS to confirm this is in the program 3-16. REMOVED from the program 4-6. 17. Health Science Storage Added to Phase II Program. CGS to confirm this is in the program 3-16. REMOVED from the program 4-6. 18. Health Science Utility Area Added to Phase II Program. REMOVED from the program 4-6. 19. Offices for Coaches (male & female) 2 300 600 20. Athletic Director's Office & Shower 1 275 275 21. AD Conference Room 1 200 200 22. Multipurpose Coaches Offc. 1 400 400 Total: Total media center spaces: FITNESS AND WELLNESS SPACES MEDIA CENTER SPACES Total: Total community and stakeholder spaces: Page 4 of 8 23. Varsity Locker Room (male) 1 1,200 1,200 24. Varsity Locker Room (female) 1 900 900 25. JV Locker Room (male & female) 2 900 1,800 26. P.E./Visiting Team Lock. (m & f) 2 900 1,800 27. Shower Room (male) 2 250 500 28. Drying Room (male) 2 125 250 29. Shower Room (female) 2 250 500 30. Locker Room Area Toilets (m &f) 4 300 1,200 31. Concession Stand 1 125 125 32. Ticket Booth 36 33. Public Restrooms 4 300 1,200 5 44 182 44,920 B. 1. Classroom 2. Instructor Office 3. Secure Arms Storage 4. Planning/Leadership/Storage 5. Outdoor Drill B. 1. Home Stadium 1750 Seat Addition in Phase II 2. Visitor Stadium 750 Seat Addition in Phase II 3. Stadium Press Box 1 600 600 4. Concessions Stand 1 1,500 1,500 5. First Aid (Home & Visitors) 1 100 100 6. Utility Closet (Visitors) 1 60 60 7. Athletic Storage 1 200 200 8. Storage 1 100 100 1. Toilets (M & F/Baseball/Softball) Sound system was requested at Baseball & Softball. GCS to confirm if this will be added. 2. Athletic Storage (Baseball/Softball) 3. Storage (Baseball/Softball) 2 100 200 4. Concessions Stand (Baseball/Softball) 5. Stadium Press Box(Baseball/Softball)? 1. Football/Soccer/Track Competition 1 Removed from Phase II Program 2. Small Practice Fields (120.x 60 yds.) 1 3. Large Practice Fields(160x70 yds.) 1 4. Competition Softball Field 1 5. Competition Baseball Field 1 6. Tennis Courts 6 2 7. Walking Path 1 GCS to advise if this will be added to Phase II Program. Cross Country Trail was requested. 19 2,760 3 5 63 182 47,680 3 6 VISUAL AND PERFORMING ARTS SPACES Outdoor Functions/Spaces ATHLETIC FIELDS BASEBALL FACILITY FOOTBALL FACILITY Stadium Support Facilities Total: Total fitness and wellness spaces: Additional outdoor storage was requested in Phase II. GCS to advise if this will be added along with desired size Total: Total: JROTC Removed from the program Page 5 of 8 A. Art Studio 1. Studios-Art 1 1 22 22 1,100 1,100 1 1 22 22 1,178 1,178 Added additional classroom to Phase II Program, adjacent to art patio 2. Digital Graphic Art 1 1 22 22 1,000 1,000 Removed from Phase II Program 3. Kiln Room 1 100 100 4. Storage (Supply & Project) 2 250 500 1 425 425 Increased storage size, material storage 250s.f., project storage 300s.f. 5. Patio (400sf) 2 5 44 2,450 2,700 1 2 22 1,603 1,603 B. 1. Band + Orchestra Perform. Room 1 1 22 22 3,300 3,300 2. Band Uniform Storage 1 400 400 3. Band Office 1 200 200 4. Band Storage 1 500 500 5. Band Practice Rooms 4 60 240 6. Music Library 1 300 300 7. Strings Office 100 8. Strings Practice Room 75 9. Strings Storage 1 300 300 1 10 22 5,240 C. 1. Choral Room 1 1 22 22 1,600 1,600 2. Storage (Uniforms) 1 400 400 3. Practice Rooms 2 60 120 4. Choral Office 1 100 100 1 5 22 2,220 D. 1. Black Box / Multi-Purpose 2. Office 3. Seating & Circulation 1 5,600 5,600 4. Stage 1 2,000 2,000 5. Orchestra Area 1 800 800 6. Control Room 1 450 450 7. Storage (Misc.) 4 100 400 8. Prop Construction & Storage 9. Prop Storage / Drama 1 1,600 1,600 10. Dressing Rooms 2 130 260 11. Backstage Restrooms 2 160 320 12. Box Office/Ticket Booth 36 13 11,430 4 33 88 21,590 1 2 22 1,603 7 1. Receiving/General Storage 1 885 885 2. Custodial Supply 1 500 500 3. Main Mechanical Room 1 8,475 8,475 4. Telecomm. Closets 8 80 640 2 124 248 Total: Total: Total: Total: Total visual and performing arts FACILITY MANAGEMENT AND SUPPORT SPACES Choral BAND Theater Page 6 of 8 5. MainTelecomm. Closet 1 120 120 6. Office for Plant Engineer 1 150 150 7. Custodial Closets 7 45 315 2 50 100 8. Main Electrical Room 1 230 230 8. Distributed Electrical Room 8 80 640 2 124 248 9. Lawn Tool Equipment Storage 800 10. Trash Dumpster Pads (4 required) 4 33 11,955 6 596 33 11,955 6 596 TOTAL BASE PROGRAM 49 264 1,110 165,591 51 97 892 50,601 Grossing factor 20,240.40 Total Area 70,841.40 1 A. 1. Studio -1 -1 -22 -22 Eliminating 2 studios in main level commons. Revised to 1 sudio 06/14/2023 Total: (1) 31 (22) B. 1. Band + Orchestra Perform. Room 2 1 22 44 1,000 1,000 Added additional to Phase II Program 03-3-2023, Orchestra Room. Carpet floor, Instrument Storage, sound system. Revised to two 1,000 student rooms 06/14/2023 2. Band Uniform Storage 3. Band Office 1 128 128 Added additional to Phase II Program 03-3-2023 4. Band Storage 1 480 480 Added additional to Phase II Program 03-3-2023 5. Band Practice Rooms 4 68 272 Added additional to Phase II Program 03-3-2023 6. Music Library 1 134 134 Added additional to Phase II Program 03-3-2023 7. Strings Office 8. Strings Practice Room 9. Strings Storage Total: 2 8 44 2,014 C. 1. Black Box / Multi-Purpose - - - - - - Added to Phase II Program. GCS to Confirm. High volumne space with risers. Share space with Drama, Orchestra, and Band. Operable partition will allow two classes to use the space simeltanously ADJUSTMENT TO PROGRAM 3/15/23 Portable risers similar to existing Fine Arts Center. Deleted from Program 06/14/2023 2. Office - - - ADJUSTMENT TO PROGRAM 3/15/23. Deleted from Program 06/14/2023 3. Seating & Circulation 4. Stage 5. Orchestra Area 6. Control Room 7. Storage (Misc.) 8. Prop Construction & Storage 9. Prop Storage / Drama 10. Dressing Rooms 11. Backstage Restrooms Total facility management and support spaces Total: Studio Clusters (2 Learning Communities) ALTERNATE - FINE ARTS ADDITION WITH 35 STUDIOS Theater (Remvoed from scope of alternate) BAND Page 7 of 8 CAG Oval CAG Oval CAG Oval 12. Box Office/Ticket Booth Total: - - - - TOTAL NSF - - - - NET CHANGE TO TOTALS IN BASE PROJECT Grossing factor - Total Area - 2 A. Stadium Support Facilities 1. Storage (Baseball/Softball) 1 400 400 2. Press Box (Baseball/Softball) 1 400 400 Provide Power. Sound system is desired. Total: 2 800 TOTAL NSF 2 800 Grossing factor 224.00 Total Area 1,024.00 BASEBALL FACILITY Outdoor Functions/Spaces ATHLETICS ALTERNATE Page 8 of 8

301 E. Camperdown Way Greenville, South Carolina 29601Location

Address: 301 E. Camperdown Way Greenville, South Carolina 29601

Country : United StatesState : South Carolina

You may also like

Summer Meals and Enrichment Program

Due: 05 May, 2024 (Today)Agency: Recreation Department

K-8 School "QQ"

Due: 29 May, 2024 (in 24 days)Agency: St. Johns County School District

RFP 23-0626E2-051 SCHOOL NURSING SERVICES FOR SCHOOL #84

Due: 30 Jun, 2024 (in 1 month)Agency: Buffalo Public Schools

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.