This project entails installation of supplemental safety measures on three at-grade crossings in the City of Emeryville. The specific at-grade crossings included in this project are: • Shellmound Street at 65th Street • Shellmound Street at 66th Street • Shellmound Street at 67th Street This project also includes traffic signal improvements at three intersections in the City of Emeryville. The specific intersections included in this project are: • Shellmound Street at 65th Street • Shellmound Street at 67th Street • Hollis Street at 67th Street This project generally includes, but is not limited to, the reconstruction of asphalt pavement; reconstruction of concrete curb/gutter/sidewalk; replacement of traffic striping and markings; installation of traffic signal systems; and installation of signs. The project also includes coordination with Union Pacific Railroad forces which will be installing new rail signal equipment, gates, track panels, conduits, and electrical equipment. The railroad portion of work is not included in the scope of work for this construction contract procurement. The pre-bid meeting occurred on December 21, 2021 at 11am. The meeting recording and attendee list can be found here: https://emeryvilleca-my.sharepoint.com/:f:/g/personal/roconnell_emeryville_org/EmkJnXpNT7pIo6b2b9c3VcMB3IYzAljRcB8kl61iqksCgg?e=7AWW1h Per Addendum No. 4, bids will now be opened on 1/25/22 at 3pm. Project Manager:- Ryan O'Connell, Senior Civil