Project: Parking Lot Repairs and Seal Stripe- Valparaiso Ref. #: RFQ #VALPO-032 Parking Lot Repairs Type: RFQ Status: Open Open Date: Jul 28th 2022, 10:00 AM EDT Questions Due Date: Aug 12th 2022, 6:00 PM EDT Close Date: Aug 19th 2022, 2:00 PM EDT Days Left: < 1 Ivy Tech Community College Valparaiso campus is in need of parking lot repairs work. Valparaiso campus has three (3) parking lots (Maintenance Lot, North Lot and the South Lot), all of which have cracks that need to be filled, there are several locations showing sink holes that need to be dug up, rebuilt. Parking lots, in general, need to be sealed and restriped after repairs. Pre-bid walkthrough is NOT scheduled; Interested parties may reach out to GMB Architecture to schedule by appointment. Anticipated start of construction: Fall 2022 preferred or Spring 2023 OngoingOpen DateOnline PortalPosting date for the OpportunityJul 28th 2022, 10:00 AM EDTN/AUpcomingClose DateOnline PortalDeadline for SubmissionsAug 19th 2022, 2:00 PM EDTN/APassedQuestions Due DateOnline PortalDeadline to submit QuestionsAug 12th 2022, 6:00 PM EDTN/A 5-5673 ITCC Valpo Parking Lot - Construction Handbook.pdfDocumentationGMB Architecture- Project Construction HandbookJul 26th 2022, 12:16 PM EDT - GMB 5-5673 C2.01 Valpo Parking Lot.pdfDocumentationProject Drawings C2.01Jul 26th 2022, 1:05 PM EDT - Submission Instructions - RFQ VALPO-032 Parking Lot Repairs.docxDocumentationSubmission InstructionsJul 28th 2022, 9:38 AM EDT - Supporting Documentation: Search FileTypeDescriptionDate CreatedActions 5-5673 ITCC Valpo Parking Lot - Construction Handbook.pdfDocumentationGMB Architecture- Project Construction HandbookJul 26th 2022, 12:16 PM EDT - GMB 5-5673 C2.01 Valpo Parking Lot.pdfDocumentationProject Drawings C2.01Jul 26th 2022, 1:05 PM EDT - Submission Instructions - RFQ VALPO-032 Parking Lot Repairs.docxDocumentationSubmission InstructionsJul 28th 2022, 9:38 AM EDT - Note To download files, Log in or Register for a Bonfire