BOLT, SHEAR

expired opportunity(Expired)
From: Federal Government(Federal)
SPE4A6-22-R-XB50

Basic Details

started - 03 Aug, 2022 (21 months ago)

Start Date

03 Aug, 2022 (21 months ago)
due - 13 Aug, 2022 (20 months ago)

Due Date

13 Aug, 2022 (20 months ago)
Bid Notification

Type

Bid Notification
SPE4A6-22-R-XB50

Identifier

SPE4A6-22-R-XB50
Department of Defense

Customer / Agency

Department of Defense
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

SUPPLIES/SERVICES: 5306-01-136-7144 ITEM DESCRIPTION: BOLT MACHINE RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS. RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR) RD003, COVERED DEFENSE INFORMATION POTENTIALLY APPLIES RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS) RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER) RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING ENGINEERING NOTES & EXCEPTIONS: 1. DWG AIA/NAS NAS6603 THRU 6620: DASH NO: -H18, ENGINEERING NOTES 1 THRU 5. 2. THIS PART HAS BEEN DESIGNATED AS A CRITICAL SAFETY ITEM (CSI). THE CRITICAL AND MAJOR CHARACTERISTICS, CRITICAL PROCESSES, INSPECTION AND OTHER QUALITY ASSURANCE REQUIREMENTS ARE NORMALLY IDENTIFIED ON THE DRAWING OR WITHIN THESE ENGINEERING NOTES. IN THE ABSENCE OF THESE SPECIFIC CSI REQUIREMENTS, THE CRITERIA IDENTIFIED IN AFI 20-106, ENCLOSURE (3), WILL APPLY. 3. PART MARKING IAW MIL-STD-130, METHOD PER SAE AS478. 4. DIMENSIONS AND TOLERANCES PER ASME Y14.5 IN LIEU OF ANSI Y14.5. 5. RELEASE OF THIS DATA TO A FOREIGN-OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE. 6. REFERENCE ALL DETAIL AND OR TIERED DRAWINGS, SPECIFICATIONS AND DOCUMENTS: THE REQUIRED USE OF A CLASS 1 ODS AS DEFINED IN CLAUSE H-305 AND OR L-513 IS PROHIBITED. THE CONTRACTOR MUST USE THE ALTERNATE PROCESSES AND OR CHEMICALS SPECIFIED IN THE APPLICABLE DRAWINGS, SPECIFICATIONS AND DOCUMENTS. 7. THE CONTRACTOR SHALL USE THE MOST CURRENT AMENDMENTS APPLICABLE TO EACH MIL SPEC,MIL STD,INDUSTRY SPEC OR INDUSTRY STD AS OF THE EFFECTIVE DATE OF THIS CONTRACT UNLESS OTHERWISE NOTED. MIL-STD-130N(1) DATED 16 NOV 2012. IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY DATA IS PROPRIETARY OR INSUFFICIENT FOR COMPETITIVE PROCUREMENT CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 7 OF 44 PAGES SPE4A6-22-R-XB50 SECTION B SUPPLY/SERVICE: 5306-01-136-7144 CONT'D THE ACCEPTABLE SOURCE(S) MUST MEET THE REQUIREMENTS OF THE CURRENT REVISION OF THE OEM DRAWING OFFERORS NOT CITED AS ACCEPTABLE SOURCES IN THE PROCUREMENT ITEM DESCRIPTION ARE REQUIRED TO OBTAIN SOURCE APPROVAL FROM THE DESIGN CONTROL ACTIVITY. SOURCE APPROVAL REQUESTS/TECHNICAL DATA PACKAGES MUST BE SUBMITTED TO DLA WITH THE OFFER. Contractor first article/preproduction approval testing required. Use DI-NDTI-80809B in preparation of the first article report. Current revision of MIL-HDBK-831 may also be used for report format guidance. First article testing shall be conducted IAW applicable drawings and drawing notes, specification, engineering instructions and specific requirements set forth in the contract. Additionally, 100% dimensional characteristics check shall be performed and results provided to the contracting officer. The first article offered must be manufactured at the facilities in which production quantities are procured under the contract. Contractor shall provide a statement along with objective evidence that test and production items meet the material and process requirements of the contract. If applicable, DD form 1423 documentation shall be provided as required. Unless F.A.T sample(s) is degraded or destroyed in testing or submitted for government fit, form, function verification (when specified by contract), the F.A.T. samples(s) may be deliverable with the last production run of the contract. Additional Wide Area Workkflow (WAWF) instructions for contractor first article test CLIN: The contractor shall code the receiving report for contractor first article test CLIN in WAWF as follows: A. Inspection at origin (source)- Enter the DCMA DODAAC listed on page 1 of the contract. B. Acceptance at destination- Enter the issue by office DODAAC listed C. Ship to code - Enter the issue by office DODAAC listed on page 1 of the contract. SAMPLING: THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE SPECIFIED BY THE CONTRACT. IF THE APPLI

700 Robbins Avenue Philadelphia PA 19111Location

Address: 700 Robbins Avenue Philadelphia PA 19111

Country : United StatesState : Pennsylvania

You may also like

BOLT, SHEAR

Due: 03 May, 2024 (in 6 days)Agency: Department of Defense

53--BOLT,SHEAR

Due: 04 May, 2024 (in 6 days)Agency: DEPT OF DEFENSE

BOLT, MACHINE

Due: 30 Apr, 2024 (in 2 days)Agency: Department of Defense

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.