The King Court Storm Sewer project consists of: (1) soil sediment and erosion control, (2) removal of the existing 10” & 12” CIP Storm Drainage including manholes and catch basins owned by the Town of East Hartford, (3) installation of new 24” and 36” RCP including manholes, catch basins, and tie-in to a DOT catch basin, (4) relocation of 28’ of 8” PVC Sanitary Sewer and two manholes owned by MDC, (5) protection of adjacent utilities, (6) demolition of paving, sidewalk, and turf, (7) installation of temporary paving patches, (8) installation of permanent paving patches, (9) milling and new overlay paving of the road, paving of driveway aprons, installation of curbs, and line painting, (10) replacement of a small section of sidewalk and (11) restoration of turf. The depth of excavation is approximately 11’ to 15’. shopping_cart Solicitation Items No solicitation items available Start Date :November 03, 2022 01:45:00 PM EDT End Date : December 20, 2022 01:00:00 PM EST Solicitation :22-009 Status :Open / ADDENDUM Delivery Terms :Free On Board Destination Payment Terms :Vendor Specified Who can respond to this bid ? : All Vendors Solicitation Number : 22-009 from Capital Region Development Auth. Erica Levis 100 Columbus Blvd Suite 500 Hartford CT, 06103 United States Tel: 860-924-8913