Design of Fairmount Avenue Bridge Rehab East/West

expired opportunity(Expired)
From: San Diego(City)
H2326266A

Basic Details

started - 27 Feb, 2024 (2 months ago)

Start Date

27 Feb, 2024 (2 months ago)
due - 03 Apr, 2024 (25 days ago)

Due Date

03 Apr, 2024 (25 days ago)
Bid Notification

Type

Bid Notification
H2326266A

Identifier

H2326266A
Purchasing & Contracting, A&E

Customer / Agency

Purchasing & Contracting, A&E
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project Title Design of Fairmount Avenue Bridge Rehab East/West Invitation # H2326266A Bid Posting Date 02/27/2024 8:08 AM (PDT) Project Stage Bidding Bid Due Date 04/03/2024 4:00 PM (PDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Categories 90656 - Landscape Architecture 90742 - Geotechnical - Soils 90779 - Surveying Services (Not Aerial) 91816 - Archeological Consulting 91842 - Engineering Consulting 91843 - Environmental Consulting 91855 - Geological Consulting And Study 91894 - Traffic Consulting 92500 - Engineering Services, Professional 96143 - Hydrological And Oceanography Services 96291 - Utility Locator Service (Underground) 541320 - Landscape Architectural Services 541330 - Engineering Services 541370 - Surveying & Mapping (except geophysical) Services 541820 - Public Relations Agencies 541620 - Environmental Consulting Service License Requirements Department Purchasing & Contracting, A&E Address
1200 Third Ave Suite 200 San Diego, California 92101 County San Diego Bid Valid Liquidated Damages Estimated Bid Value Between $1 Million and $1.4 Million Start/Delivery Date Project Duration Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting Information Pre-Bid Meeting Yes - Not Mandatory Pre-Bid Meeting Date 03/13/2024 11:00 AM (PDT) Pre-Bid Meeting Location Microsoft Teams meeting Meeting ID: 223 985 416 889 Passcode: WMtXFj Or call in (audio only) +1 945-468-5511,,306917693# United States, Dallas Phone Conference ID: 306 917 693# Meeting information in section 6.2 of the RFP. Agenda and link to meeting will be provided the week of meeting. Online Q&A Online Q&A No Contact Information Contact Info Alexander Mendivil 858-614-5743 AJMendivil@sandiego.gov Bids to Owner's Agent Description Scope of Services The City of San Diego received Federal Highway Administration (FHWA) Highway Bridge Program (HBP) Funding administered through the California Department of Transportation (Caltrans) to rehabilitate the Fairmount Ave Bridge Left/Right. The bridges, located southeast of Mission Valley in the City of San Diego, are classified as “Structurally Deficient” by the California Department of Transportation (Caltrans). The existing bridges are located on Fairmount Avenue at the intersection of Aldine Drive. Fairmount Avenue is a divided four lane Urban Principal Arterial that runs south-north with a posted speed limit of 55 mph in the northbound direction and 50 mph in the southbound direction. It is a local route that primarily services the communities of Kensington and Talmadge south of I-8 and provides additional connectivity to Normal Height and City Heights. The substructure of both existing bridges consists of three continuous reinforced concrete box girder spans on two open end reinforced concrete diaphragm abutments and two reinforced concrete column bents, supported by steel piles. Each bridge carries two lanes of vehicular traffic with no shoulders and no sidewalk. The overall width of each bridge deck is 28 feet. Phase 1 of Fairmount Avenue bridge rehab east/west project that included preliminary engineering studies and evaluations, preliminary environmental and preliminary geotechnical study has been completed. Different alternatives for bridge rehabilitation and replacement were developed and final alternative 3A is selected as the following: Proposed project will involve widening the existing bridges with precast concrete box girders to provide two 12-foot lanes, an 8-foot outer shoulder, a 4-foot inner shoulder, and a barrier-separated 6-foot sidewalk. Other design elements include providing 6-foot sidewalks along the north side of Aldine Drive between the ramps to Fairmount Avenue, a retaining wall along the northbound Fairmount Avenue on-ramp, and ADA upgrades. Under this proposal, consultant will need to provide work for phase 2 that includes: Preparation of environmental document (CEQA and NEPA), final plans, specifications, and estimates (PS&E) for final alternative selected in Phase 1. Also, to include any environmental studies, technical reports or memorandums that may be deemed necessary to complete PS&E phase. Engineering support during the bid and award phase for construction contract and engineering support during construction, including the assistance in preparation of the As-builts for the project upon construction completion. Other Details Notes Special Notices Local Programs & Policies Place eBid

1200 Third Ave Suite 200 San Diego, California 92101Location

Address: 1200 Third Ave Suite 200 San Diego, California 92101

Country : United StatesState : California

You may also like

6th Avenue East Extension

Due: 01 May, 2024 (in 2 days)Agency: City of Duluth

22-6297 - 42038 - Camelback Road - SR303 to 152nd Avenue (Design)

Due: 23 Jul, 2024 (in 2 months)Agency: City of Goodyear

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.