2024 Godwin Pump Replacements

From: Cherry Hill(Town)

Basic Details

started - 27 Mar, 2024 (1 month ago)

Start Date

27 Mar, 2024 (1 month ago)
due - 16 May, 2024 (in 18 days)

Due Date

16 May, 2024 (in 18 days)
Bid Notification

Type

Bid Notification

Identifier

N/A
Cherry Hill Township

Customer / Agency

Cherry Hill Township
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

ADDENDUM #1 HAS BEEN ISSUED AND MAY BE DOWNLOADED BELOW. BID OPENING DATE CHANGED TO MAY 16, 2024, 11:00AM. ADDENDUM AND ADDENDUM ACKNOWLEDGEMENT FORM MUST BE SIGNED AND ENCLOSED WITH SUBMISSION. FAILURE TO INCLUDE BOTH SIGNED AND COMPLETED FORMS WILL RESULT IN REJECTION OF YOUR BID. ADDENDUM ALSO INCLUDES REVISED BID FORM AND REVISED SUBCONTRACTOR DECLARATION WHICH MUST BE COMPLETED/SIGNED/AND ENCLOSED WITH SUBMISSION. ******************************************************************************************************************************The Source of Funding for this Project will include American Rescue Plan Act of 2021 (ARPA) - State and Local Fiscal Recovery Funds (SLFRF).BASE BID: In general, the work on this project consists of furnishing and installing an emergency standby bypass pumping system for 4 pump stations located throughout Cherry Hill, complete as specified within these Contract Documents and shown on Drawings, appended to these specifications. The bypass pump
for each station shall be installed on a concrete pad located within the boundaries of the site. In addition to installing the new emergency standby bypass pumping system, the work shall also include the decommissioning and removal of an existing backup generator on each site. Where an existing concrete pad is available the pump may be installed on the existing concrete pad with the approval of the Engineer. Some sites may require the old pad to be removed and a new pad to be installed. After work has been completed, the Contractor shall be responsible for all restoration of the work site. All work shall be constructed in accordance with the Cherry Hill Township requirements. The Contractor shall coordinate efforts with the Township to notify affected residents during construction.ADD/ALTERNATE BID: In general, the work on this project consists of installing an emergency standby bypass pumping system for the Haddontowne pump station located in Cherry Hill. The bypass pump shall be installed on a new concrete pad located within the boundaries of the site. After work has been completed, the Contractor shall be responsible for all restoration of the work site. All work shall be constructed in accordance with the Cherry Hill Township requirements. The Contractor shall coordinate efforts with the Township to notify affected residents during construction.

Cherry Hill, NJ 08002, USALocation

Address: Cherry Hill, NJ 08002, USA

Country : United StatesState : New Jersey

You may also like

Replacement of Sewer Pumps

Due: 28 May, 2024 (in 1 month)Agency: City of Kingsland

Wet Well Mounted Sewer Pump Station

Due: 29 Apr, 2024 (in 1 day)Agency: City of Hot springs

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction