The work for the LOWER CANAL BRIDGE DEMOLITION shall consist of, but not be limited to, the complete and satisfactory construction of installation of:- Bridge Removal (2)o Continental Mill Pedestrian Bridge o Miller/Weisman Pedestrian BridgeWork includes the removal of two (2) steel-beam pedestrian bridges spanning the Lower