The existing fishing pier at Lake Ahquabi was built in the early 1990s. The pier needs a renovation as the decking boards, shelter, and handrails are in poor condition and need to be replaced. This project will remove the enclosed shelter, add structural steel to the superstructure and a new, open air, steel shelter will be installed. New treated wood floor joists, composite decking, treated wood handrails, fish cleaning stations, and electrical will be installed. The adjacent boardwalk, concrete building slab, and asphalt trail will be removed and replaced with a new accessible seawall sidewalk to the pier.
Project documents, including plans, specifications, proposal forms, and addenda for this project are available at Beeline and Blue, 2507 Ingersoll Ave, Des Moines, IA 50312. Please visit
www.beelineandblue.com or contact (515) 244-1611 for more information.
Project Engineer: Ryan Richey
Contact: 515-979-0107 or
ryan.richey@dnr.iowa.govBID CLOSING DATE AND TIME: 12/9/2021 AT 11:00 AM