This a a two phase design build construction requirement. Please see solicitation attached. This project includes the construction of a 10,000 gross square foot new Access Control Facility with the capacity to support the processing of visitors per criteria established by the Unified Facilities Criteria (UFC). These requirements include a waiting area, service counter, break room, offices, restrooms, electrical, mechanical and fire alarm/suppression.The supporting facilities include site preparation, infrastructure improvements, utility services, perimeter security measures, infrastructure for the telecommunication and the physical security system. The site preparation will include standard clearing, grubbing, cut, fill, grading and environmental (sustainable) features. A surface parking lot and the demolition of the existing ACF will also be a part of this project. The new facility will be required to meet the minimum DoD Antiterrorism standards and to meet the requirements of the American Disabilities ACT (ADA). There may be minimal asbestos, lead paint and bio-hazards remediation in the existing ACF building.The facility is required to be in compliance with the UFC 1-200-02 High Performance and Sustainable Building Requirements, with Change 4 as dated 01 October 2019. This policy includes the Leadership in Energy and Environmental Design (LEED) Silver which requires certification via third party and requires compliance with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as