Notice of Intent to Begin ENgineering and Evnironmental Studies-Deering Airport and Access Road Improvements

expired opportunity(Expired)
From: Alaska(State)
Deering Airport and Access Road Improvements NFAPT

Basic Details

started - 01 Sep, 2020 (about 3 years ago)

Start Date

01 Sep, 2020 (about 3 years ago)
due - 10 Sep, 2020 (about 3 years ago)

Due Date

10 Sep, 2020 (about 3 years ago)
Bid Notification

Type

Bid Notification
Deering Airport and Access Road Improvements NFAPT

Identifier

Deering Airport and Access Road Improvements NFAPT
Transportation and Public Facilities

Customer / Agency

Transportation and Public Facilities
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

 
Notice of Intent to Begin Engineering and Environmental StudiesDeering Airport and Access Road Improvements NFAPT00249RESCHEDULED PUBLIC MEETINGThe Alaska Department of Transportation and Public Facilities (DOT&PF), in cooperation with the Federal Aviation Administration (FAA), proposes the following improvements at Deering Airport, Deering, Alaska:
Rehabilitate and resurface the airport.                                                                
Repair the runway embankments.                                                                         
Construct a new airport access road and new bridge over Smith Creek.       
Apply dust palliative to airport traffic surfaces.
Use existing gravel bars of the Inmachuk River floodplain as material sources, and mobilize these materials and construction equipment to the project area using the existing community barge landing and developed roads.
Replace the airport lighting system.
Restore sufficient
airport drainage.
Construct a snow fence.The project purpose is to remedy Deering Airport deficiencies, bring the airport to current FAA design standards, and meet criteria identified in the Alaska Statewide Transportation Plan (ASTP) and Alaska Aviation System Plan (AASP). Deering Airport has two gravel surfaced, perpendicular runways designated as Runway (RW) 3-21 and RW 12-30. Over time, winter snow removal operations have graded most surfacing off both runways’ surfaces, resulting in persistent rutting and water ponding on the underlying runway embankment. Additionally, drifting snow collects west of the runways’ intersection, requiring a substantial snow removal effort and creating springtime meltwater ponding adjacent the runway embankments. These conditions keep airport maintenance costs high. Additionally, the airfield’s surface course and lighting system are beyond their useful life and need rehabilitation or replacement.The Deering Airport and its access road are also subject to flooding due both to spring ice jams in the Inmachuk River and strong, periodic storm surges from Kotzebue Sound. For example, in 2015 and 2016, ice jams at the Inmachuk River mouth submerged portions of the airport access road (Deering-Inmachuk Road), which provides access between the Deering community and the airport (and also lies mostly off airport property).  The ice jam also extended to one runway threshold embankment (Figure 2). In 2016, these conditions caused the State of Alaska to declare a community disaster at Deering. There are no documented flood events overtopping the airport surfaces.Please join us in person or by phone to discuss the proposed project!When: Wednesday September 09, 2020 at 6:00 pm   Where:  Deering City Building   How: See belowDeering residents: can call Bonita Barr
(907-363-2138) for info on attending in person.All others: call in
Toll-Free:
(800) 316-6338 & then use Code:
60104#See attached Figures 1-7 for depictions of proposed airport & road improvements. You can mail or email questions, comments, suggestions or other information to the DOT&PF Project Manager Jonathan Hutchinson (contact info below).  While we accept information at any time, to best assist the design team please provide comments by
October 09, 2020.The proposed project will comply with Section 106 of the National Historic Preservation Act; Executive Orders: 11990 (Wetlands Protection), 11988 (Floodplain Protection), 12898 (Environmental Justice), 11593 (Historic Preservation), 13084 (Consultation and Coordination with Indian Tribal Governments); the Clean Air Act, Clean Water Act, Fish and Wildlife Coordination Act, and U.S. DOT Act Section 4(f).To request further information about this project, you may contact:Jonathan Hutchinson, P.E., DOT&PF Engineering Manager2301 Peger Road, Fairbanks, AK, 99709jonathan.hutchinson@alaska.govWhat Project Activities and Milestones are Coming Up Next?
Geotechnical Investigations – Crew will be in Deering in September 2020.
Draft Environmental Assessment – Currently in development, with proposed completion by Winter 2021.
Final Design – scheduled to be complete by December, 2021.
Advertise the Project for Bid – January 2022.
Proposed Construction Timeframe – 2022-2023

Arctic Region, Central Region, Fairbanks, Interior Region, Kotzebue, Nome, Northern Region, Statewide, Western Region ,AlaskaLocation

Address: Arctic Region, Central Region, Fairbanks, Interior Region, Kotzebue, Nome, Northern Region, Statewide, Western Region ,Alaska

Country : United StatesState : Alaska

You may also like

Notice of Intent

Due: 02 Jan, 2025 (in 8 months)Agency: Alberta Public Sector

Notice of Intent to Sole Source

Due: 27 Apr, 2024 (in 7 days)Agency: ENERGY, DEPARTMENT OF

Morvant Pump Station Access Road Improvements

Due: 24 Apr, 2024 (in 4 days)Agency: Lafourche Parish Government

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Public Notices,