Replace Halon & Electrical at GWEF

expired opportunity(Expired)
From: Federal Government(Federal)
FA2823-19-R-4012

Basic Details

started - 27 Mar, 2019 (about 5 years ago)

Start Date

27 Mar, 2019 (about 5 years ago)
due - 10 Apr, 2019 (about 5 years ago)

Due Date

10 Apr, 2019 (about 5 years ago)
Pre-Bid Notification

Type

Pre-Bid Notification
FA2823-19-R-4012

Identifier

FA2823-19-R-4012
Department of the Air Force

Customer / Agency

DEPT OF DEFENSE (708882)DEPT OF THE AIR FORCE (60448)AFMC (17421)AIR FORCE TEST CENTER (3211)FA2823 AFTC PZIO (1460)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (1)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

///The original solicitation FA2823-19-R-4012 / Replace Halon & Electrical at GWEF is now FA2823-19-R-A005 / Replace Halon & Electrical at GWEF.  The solicitation package will be posted under the new title with amended proposal due dates, site visit information, etc. All other terms and conditions remain unchanged.///Eglin Air Force Base (AFB), FL has a requirement to Replace Halon & Electrical at GWEF.  The North American Industry Classification System (NAICS) code for this requirement is 236220 with a size standard of $36.5M.  The acquisition is anticipated to be a competitive 100% Small Business set aside. This effort is anticipated to be a Lowest Price Technically Acceptable (LPTA) Source Selection Process acquisition.  Award will be made based upon the Best Value to the Government in accordance with FAR Part 15.3.The intent of this project is to replace all Halon-supplied fire protection to Bldg. 374 / Guided Weapon Evaluation Facility (GWEF) with new code-compliant water suppression system, on Eglin AFB, FL in accordance with the Statement of Work, Project Drawings, the Unified Facilities Guide Specifications (UFGS), Design Specifications 18AK, the Eglin AFB Architectural Standards, the Eglin Wire and Communications Specifications and Standards, as well as the Technical Specifications for the Construction and Management of Sensitive Compartmented Information Facilities Version 1.3 for IC Tech Spec ICD / ICS 705.The performance period is 194 days after the Notice to Proceed (NTP). Point of Contact:Christopher P. Dutton, Contract Specialist, Email

Guided Weapons Evaluation Facility Eglin AFB, Florida 32542 United StatesLocation

Place Of Performance : Guided Weapons Evaluation Facility

Country : United States

You may also like

Replace Pilings, B1009

Due: 02 May, 2024 (in 4 days)Agency: DEPT OF DEFENSE

Classification

236 -- Construction of Buildings/236220 -- Commercial and Institutional Building Construction
naicsCode 236220Commercial and Institutional Building Construction
pscCode ZMAINT, REPAIR, ALTER REAL PROPERTY