Renovate Hangar 750 for 920 Row

expired opportunity(Expired)
From: Federal Government(Federal)
W912QR-RenovateHangar750PatrickAFB

Basic Details

started - 09 Jan, 2020 (about 4 years ago)

Start Date

09 Jan, 2020 (about 4 years ago)
due - 20 Jan, 2020 (about 4 years ago)

Due Date

20 Jan, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
W912QR-RenovateHangar750PatrickAFB

Identifier

W912QR-RenovateHangar750PatrickAFB
DEPARTMENT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (709038)DEPT OF THE ARMY (133115)USACE (38131)LRD (5560)US ARMY ENGINEER DISTRICT LOUISVILL (2089)
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Description: A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service Disabled Veteran Owned Business and you are interested in this project please respond appropriately. The proposed project is a design-build requirement.Repair, modernize and properly configure this 80-year-old hangar facility (B750) to support the current needs of 920th multi-maintenance and administrative functions. Major features of work include: Evaluate HVAC systems and remove/replace as required. Renovate restrooms as required. Remove all unnecessary interior walls to provide a code compliant open-office concept, replacing flooring, stair treads, and ceiling tile. Repaint all interior walls, and replace light fixtures, ducts. Include additional communication/electrical outlets as required. Reconfigure and replace
interior utilities such as power, lighting, plumbing and fixtures, HVAC, fire suppression, and communications support. Balance HVAC system upon completion of the project. Install bird netting, install high capacity fans, and paint/seal floor in the bay area. Paint exterior. Provide elevator on north side for code compliance. Expand shop footprint to the south by 3,100SF (New Work). Include space in Mech rooms for dehumidification equipment. Total renovation square footage is approximately 71,624SF. Total new work/ expansion square footage is 3,100SF.Contract duration is estimated at 520 calendar days. The estimated cost range is between $10.0 Million and $25.0 Million. NAICS code is 236220. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses or Service Disabled Veteran Owned Business contractors should respond to this survey by email on 20 January 2020 by 10:00 Eastern Standard Time.Responses should include: 1. Identification and verification of the company’s small business status.2. Contractor’s Unique Identifier Number and CAGE Code(s).3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.4. Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference.  References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope to this project include: Provide documentation demonstrating experience in construction, with at least 50% renovation work, for multi-story buildings which include administrative/ office spaces, maintenance and repair shops and large, open-bay maintenance or storage facilities and involving management of multiple sub-contractors.b. Projects similar in size to this project include: Multi-story building(s) having square footage of at least 50,000 SF.c. Based on the information above, for each project submitted, include:Current percentage of construction complete and the date when it was or will be completed.Scope of the project. Size of the project.The dollar value of the construction contract and whether it was design-bid build or design-build.The percentage of work that was self-performed as project and/or construction management services or physical construction type work.Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting (DEVIATION 2019-O0003); they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self performed on this project, and how it will be accomplished.NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.Email responses to Glenn Moon at Glenn.W.Moon@usace.army.mil. If you have questions please contact Glenn Moon at (502) 315-6177. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.

Patrick AFB ,
 FL   USALocation

Place Of Performance : N/A

Country : United States

Classification

naicsCode 236220Commercial and Institutional Building Construction
pscCode Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS