City of Rosenberg Lift Station No. 8 (West Street) Reconstruction Project

expired opportunity(Expired)
From: Garver(Co-op)
2024-06B

Basic Details

started - 13 Mar, 2024 (1 month ago)

Start Date

13 Mar, 2024 (1 month ago)
due - 28 Mar, 2024 (29 days ago)

Due Date

28 Mar, 2024 (29 days ago)
Bid Notification

Type

Bid Notification
2024-06B

Identifier

2024-06B
Garver

Customer / Agency

Garver
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Work of the Project generally includes replacement of the existing Lift Station No. 8. More specifically, the Work includes, but is not limited to, construction of the following: Lift Station No. 8 Remove, transport and dispose accumulated sludge, grit, and solids from existing wet well of the lift station. Demolition including but not limited to pumps, piping, valves, and supports; electrical control panels, conduits, conductors, motor control centers, concrete pump bases, lift station top of slab concrete, reinforcement, and access openings, and all related appurtenances as included in the Specifications and shown on the Drawings. Furnish all labor, equipment, material and supervision necessary for the installation of two submersible pumps with cooling jackets, all piping, valves, fittings, brackets, cathodic protection, and piping supports, including painting, and other miscellaneous accessories and appurtenances necessary for the operation of the lift station as included in the
Specifications and shown on the Drawings. Furnish, all labor, equipment, material, and supervision necessary for the installation of electrical and control components including but not limited to power system study, radar level instruments, electrical fused disconnect, junction boxes, conduits, conductors, duct banks, manual transfer switch, SCADA including but not limited to software, components, programming, monitoring and integration as included in the Specifications and shown on the Drawings. Install cast-in-place top of slab for lift station structure as indicated on the Drawings and in accordance with the Specifications. Furnish and apply protective coating system (Spectra Shield) as included in the Specifications and shown on the Drawings. Prepare subgrade and install reinforced concrete pavement as included in the Specifications and shown on the Drawings. Furnish all labor, equipment, material, and supervision necessary for the installation of fencing, gates, backflow preventer, yard piping, bollards and site improvements as included in the Specifications and shown on the Drawings. Install proposed detention pond as indicated on the Drawings and in accordance with the Specifications. Furnish and install hydromulch seeding and sodding as included in the Specifications and as shown on the Drawings.

Garver 12141 Wickchester Lane Houston, Texas 77079 https://garverusa.com/Location

Address: Garver 12141 Wickchester Lane Houston, Texas 77079 https://garverusa.com/

Country : United StatesState : Texas

You may also like

City Wide Street & Utility Reconstruction

Due: 30 Apr, 2024 (in 3 days)Agency: City of Eau Claire

LINCOLN LIFT STATION REHABILITATION

Due: 16 May, 2024 (in 19 days)Agency: Clark County Water Reclamation District

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.