Construction-Related Services for a New Comprehensive High School SE
Opportunity Description:The scope of services shall include, but not be limited to, the completion of all designated tasks appurtenant to site evaluation for a new comprehensive school.
The Consultant shall perform the following geotechnical services as indicated in the District’s RFQP and shall include, without limitation:
•Research and review of previous geotechnical investigation and geologic/fault reports for the site and vicinity
•Geologic reconnaissance of the site
•Subsurface exploration of the site
•Laboratory testing of selected soil samples obtained during drilling
•Observe and test compaction of subgrades to receive AC pavement and/or Portland cement concrete
•Provide onsite compaction testing for AC pavement areas
•Perform required laboratory tests on retained samples from onsite and/or imported materials for fill placement as required on the soils report
•Observe, inspect, sample, and test all structural concrete placed at the project site including the placement of all reinforcing steel
•Observe and inspect all structural steel erection including welding
•Upon completion of Project, prepare DSA 291 and a DSA 293 and any other forms per the new close-out procedures adopted by DSA
In addition, the Consultant shall perform geotechnical observations and testing services during construction of the Project, and shall include, without limitation:
•Risk Assessments per Title 5 of the California Code of Regulations
•Other Geohazard Assessments
•Health Risk Assessments including Toxic Air Emissions
•Geohazard Studies
•Railroad Risk Studies
•Pipeline/Water Storage Tank Risk Studies
•Electromagnetic Field Management Plans
•Hazardous waste site investigations
•Safety assessments
•Air emissions assessments
•Groundwater and soil vapor extraction/remediation systems
•Site visits to monitor the contractor’s earthwork construction activities
•Observations and testing during site grading, installation of underground utilities, setting sub-grade and installing aggregate base, and foundation excavations
•Engineering consultations
•Project management of geotechnical concerns
•Consultant shall prepare and present a final report to the District within__days before/after the District’s recording of a notice of completion
Questions and requests on this Request for Proposal can go to:
Sofia Ronquillo
5801 Sundale Avenue
Bakersfield, CA 93303
661-827-3122
Posted:1/2/2018
January 17, 2018
Location
Address: 1303 J Street, Suite 520 Sacramento, CA 95814